🧱 Construction Materials and ManagementStaff Selection Commission and Railway Recruitment Boards

Start JE Exams Construction Materials and Management preparation free Like it? Continue at just ₹29/month — less than ₹1 a day

3 chapters in syllabus order, in English and Hindi.

First chapter free — no card needed

  • 3chapters
  • 72quiz questions
  • EN + हिंevery chapter in both

Try it now

Try a real Construction Materials and Management question

A real question from the course. No sign-up needed.

From the chapter: Construction Materials: Cement, Concrete, Steel, Timber, Bitumen, Bricks and Mortar

Water is added on site to a concrete mix that has stiffened, to restore workability. The most accurate description of the consequence is that

Show the answer and why

Answer: A.

Both are permanently reduced, and by the same mechanism. Cement hydrates completely with only about 0.23–0.25 of its own mass of water. Every mix carries more, and the surplus is there purely for workability — but it occupies volume in the fresh concrete, and when it eventually dries it leaves that volume behind as capillary porosity. Those pores do two things at once. They reduce strength, because there is less solid per unit volume and every void concentrates stress. And they reduce durability, because a connected pore network is the route by which chloride, sulphate, moisture and carbon dioxide reach the reinforcement — which is why IS 456 specifies a maximum w/c for each exposure condition independently of the strength grade: a mix can be strong enough and still be too permeable. Option (d) is the most tempting wrong answer and inverts the physics: the water leaving is precisely what creates the damage; nothing is recovered by drying, because the pore is what remains. Option (b) is wrong because cover and permeability are complementary, not alternative — cover only helps if the concrete it is made of resists ingress. Option (c) is the subtle one, and it fails on Abrams’ law: strength depends on the w/c ratio, not on the cement content, so adding cement and water in the same proportion keeps w/c unchanged and simply produces more concrete of the same strength — useless if the aim was to restore what was lost, and in any case unmixable into a batch already in the truck. The correct remedy is a superplasticiser, which disperses the cement grains electrostatically and delivers workability without adding water at all.

Price

Start free. Upgrade when you are ready.

  • Basic₹29/monthless than ₹1 a day · every JE Exams chapter, mocks and PYQs
  • Free₹0first chapter + 1 full mock, no card
  • Premium₹399 oncethen ₹29/month · AI mentor, answer writing, unlimited mocks
Start JE Exams free

Prices include GST. Cancel anytime. Fees worked out per day →

Start JE Exams Construction Materials and Management today

First chapter free — no card needed. Then the whole course is ₹29 a month — less than ₹1 a day. Cancel anytime.

Start free
Learn in reels

Concept reels. One idea, about a minute each.

Swipe up like Instagram, but every reel teaches one concept from your syllabus, and opens the chapter it comes from. Free to watch, no account needed.

Watch reels →

Official sources

CareerCraft Labs is a private study platform. It is not a government body and is not affiliated with, endorsed by, or authorised by any examination authority. We do not accept applications, conduct examinations, or issue government results.

Notifications, syllabi, exam dates and results are official only on the conducting body's own website. Always verify there before you act on anything you read here.