Production and Industrial Engineering for the Junior Engineer Papers: Machining, Metrology, Planning and Inventory, Work Study and Quality
2. Metrology: measurement, limits, fits and tolerances
A vernier caliper reads to its least count, the difference between one main-scale division and one vernier division: with 49 mm divided into 50 parts on the vernier and 1 mm on the main scale, the least count is 1 − 49 ÷ 50 = 0.02 mm. A micrometer reads to 0.01 mm. Slip gauges are blocks wrung together to build exact lengths, comparators show a deviation from a master, and a coordinate measuring machine (CMM) probes points in three dimensions. Surface finish is stated as roughness average Ra in micrometres.
| Term | Meaning |
|---|---|
| Tolerance | Upper limit − lower limit of a dimension |
| Allowance | Intended difference between the largest shaft and smallest hole (the tightest fit) |
| Clearance fit | Shaft is always smaller than the hole |
| Interference fit | Shaft is always larger than the hole (a press fit) |
| Transition fit | Either clearance or interference may result |
For a hole of 50 +0.025/0 mm and a shaft of 50 −0.009/−0.025 mm the largest hole is 50.025 and the smallest shaft is 49.975, so the maximum clearance is 0.050 mm; the smallest hole 50.000 against the largest shaft 49.991 gives a minimum clearance of 0.009 mm. Because both are positive it is a clearance fit. In the hole-basis system the hole has a fixed lower deviation of zero and the shaft is varied to get the fit, because holes are harder to finish than shafts. GO and NO-GO gauges check the two limits quickly.
A vernier caliper reads to its least count, the difference between one main-scale division and one vernier division: with 49 mm divided into 50 parts on the vernier and 1 mm on the main…
3. Production planning, inventory and project scheduling
Economic order quantity balances ordering cost against holding cost: EOQ = √(2DS ÷ H). For yearly demand D = 1,200 units, ordering cost S = ₹100 and holding cost H = ₹6 per unit per year, EOQ = √(2 × 1,200 × 100 ÷ 6) = √40,000 = 200 units, so six orders a year. At the EOQ the annual ordering cost equals the annual holding cost. Break-even volume is fixed cost ÷ (price − variable cost per unit): ₹60,000 ÷ (₹50 − ₹30) = 3,000 units.
In PERT each activity has an optimistic time a, a most-likely time m and a pessimistic time b; the expected time is (a + 4m + b) ÷ 6 and the variance is ((b − a) ÷ 6)². For a = 2, m = 5, b = 14 days the expected time is 6 days and the variance 4. The critical path is the longest path through the network and fixes the project duration; activities on it have zero slack. CPM uses a single deterministic time. For forecasting, exponential smoothing sets the next forecast = α × actual + (1 − α) × last forecast: with α = 0.2, actual 120 and last forecast 100, the next forecast is 104. Production control uses Gantt charts, routing, scheduling and dispatching.
Economic order quantity balances ordering cost against holding cost: EOQ = √(2DS ÷ H). For yearly demand D = 1,200 units, ordering cost S = ₹100 and holding cost H = ₹6 per unit per year…
4. Work study, plant layout and quality control
Work study has two arms: method study (find the best way to do a job) and work measurement (find the time it takes). From a stopwatch time study: normal time = observed time × rating ÷ 100 and standard time = normal time × (1 + allowance). An observed 2 min at 110% rating with a 10% allowance gives 2 × 1.10 × 1.10 = 2.42 min. Plant layouts are product (a line for one product), process (similar machines grouped), fixed-position (a ship, a bridge) and cellular (group technology). A good layout cuts material handling.
Statistical quality control uses control charts. For sample means of size n from a process with mean μ and standard deviation σ, the 3-sigma limits are μ ± 3σ ÷ √n: with μ = 50, σ = 2 and n = 4 the upper limit is 50 + 3 × 2 ÷ 2 = 53. A point outside the limits signals an assignable cause. Acceptance sampling judges a lot by a sample, and its operating-characteristic curve shows the chance of accepting lots of each quality. Pareto analysis shows that a few causes give most defects (the 80 : 20 rule); 5S, Kaizen and Kanban (the pull signal of just-in-time) are lean tools. CNC machines run from coded programmes, and a flexible manufacturing system links several with automated handling.
Work study has two arms: method study (find the best way to do a job) and work measurement (find the time it takes). From a stopwatch time study: normal time = observed time × rating ÷ 100…
5. Worked problems: Taylor's tool life and the economic order quantity
Taylor's tool-life equation is V Tⁿ = C, where V is the cutting speed in m/min, T the tool life in minutes and n an index that depends on the tool material. Because T = (C ÷ V)^(1/n), a small rise in speed costs a large fall in life. With n = 0.25 the exponent 1 ÷ n is 4, so doubling the speed divides the tool life by 2⁴ = 16. This is why finishing cuts are run at moderate speeds and why carbide and ceramic tools, with higher n, tolerate much faster cutting.
| Quantity | Formula | Worked value |
|---|---|---|
| Cutting speed | V = πDN ÷ 1,000 (D in mm) | D = 50 mm, N = 400 rpm gives 62.8 m/min |
| Turning time | t = L ÷ (f N) | 200 mm at 0.25 mm/rev and 400 rpm takes 2.0 min |
| Life ratio when speed doubles | 2^(1 ÷ n) | n = 0.25 gives a fall by 16 times |
| Economic order quantity | EOQ = √(2DS ÷ H) | D = 1,200 a year, S = ₹300, H = ₹24 gives 173 |
In the EOQ formula D is the yearly demand, S the cost of placing one order and H the cost of holding one unit for a year. At the EOQ the yearly ordering cost equals the yearly holding cost, which is a quick check: (1,200 ÷ 173) × 300 is about ₹2,080 and (173 ÷ 2) × 24 is about ₹2,076.
Taylor's tool-life equation is V Tⁿ = C, where V is the cutting speed in m/min, T the tool life in minutes and n an index that depends on the tool material. Because T = (C ÷ V)^(1/n), a…
Second Pass: Cutting Speed, Removal Rate, Break-even, Standard Time, Fits and PERT
Cutting speed is V = πDN/1000 m/min with D in mm. Metal removal rate in turning is speed × feed × depth of cut. Standard time = normal time × (1 + allowance), where normal time = observed time × rating. A fit has clearance if the shaft is smaller than the hole and interference if larger. PERT expected time is (O + 4M + P)/6 and the variance is ((P − O)/6)².
| Item | Working | Answer |
|---|---|---|
| D = 100 mm, N = 318 rpm | π × 100 × 318/1000 | ≈ 100 m/min |
| V = 100 m/min, f = 0.2, d = 2 | 100,000 × 0.2 × 2 | 40,000 mm³/min |
| Observed 2 min, rating 120%, allowance 10% | 2 × 1.2 × 1.1 | 2.64 min |
| O = 2, P = 14 | ((14 − 2)/6)² | variance 4 |
Cutting speed is V = πDN/1000 m/min with D in mm. Metal removal rate in turning is speed × feed × depth of cut. Standard time = normal time × (1 + allowance), where normal time = observed…
Key takeaways
- V = πDN ÷ 1,000; turning time = L ÷ (fN); blanking force = perimeter × thickness × shear strength.
- Least count = 1 MSD − 1 VSD; clearance, interference and transition fits depend on the limits of hole and shaft.
- EOQ = √(2DS ÷ H); break-even = fixed cost ÷ contribution per unit; PERT time = (a + 4m + b) ÷ 6.
- Standard time = observed × rating × (1 + allowance); control limits are μ ± 3σ ÷ √n.
- Taylor: V Tⁿ = C, so doubling speed divides life by 2^(1/n); EOQ = √(2DS ÷ H), where ordering cost equals holding cost.
Practice questions (25)
Attempt each one before opening the answer. Every explanation names the tempting wrong option as well as the right one, because that is where marks are lost.
A bar of 50 mm diameter is turned at 400 rpm. The cutting speed is about:
Show answer
Answer: B — 62.8 m/min
V = πDN ÷ 1,000 = π × 50 × 400 ÷ 1,000 = 62.8 m/min. Using the radius instead of the diameter halves it (31.4), and forgetting the factor 1,000 gives 62,832 mm/min, which is the same speed in the wrong unit.A 200 mm length is turned at a feed of 0.25 mm per revolution and 400 rpm. The machining time is:
Show answer
Answer: B — 2 min
Time = L ÷ (f × N) = 200 ÷ (0.25 × 400) = 2 min. The table moves 0.25 × 400 = 100 mm every minute. A common error is dividing by the feed alone and multiplying by rpm.A circular blank of 40 mm diameter is cut from a sheet 2 mm thick with a shear strength of 300 MPa. The blanking force is about:
Show answer
Answer: B — 75.4 kN
Force = perimeter × thickness × shear strength = π × 40 × 2 × 300 = 75,398 N ≈ 75.4 kN. Using the area of the disc (π × 20² = 1,257 mm²) instead of the sheared edge area is the typical slip, because shear acts around the circumference.
Show the other 22 questions
A hole is 50 +0.025/0 mm and the shaft is 50 −0.009/−0.025 mm. The maximum clearance is:
Show answer
Answer: C — 0.050 mm
Maximum clearance = largest hole − smallest shaft = 50.025 − 49.975 = 0.050 mm. Minimum clearance is 0.009 mm (smallest hole − largest shaft). Subtracting the wrong pair of limits is the usual source of the other values.A vernier caliper has 50 vernier divisions equal to 49 main-scale divisions of 1 mm each. Its least count is:
Show answer
Answer: B — 0.02 mm
One vernier division is 49 ÷ 50 = 0.98 mm, so the least count is 1 − 0.98 = 0.02 mm. A micrometer, not a vernier, is the instrument with the 0.01 mm least count.A firm needs 1,200 units a year, each order costs ₹100 to place and holding costs ₹6 per unit per year. The economic order quantity is:
Show answer
Answer: B — 200 units
EOQ = √(2DS ÷ H) = √(2 × 1,200 × 100 ÷ 6) = √40,000 = 200 units. Placing the order of 600 (half the year's demand) would hold far more stock than needed, raising holding cost above ordering cost.A job has optimistic, most-likely and pessimistic times of 2, 5 and 14 days. By the PERT formula its expected time and variance are:
Show answer
Answer: A — 6 days and 4
Expected time = (2 + 4 × 5 + 14) ÷ 6 = 36 ÷ 6 = 6 days, and variance = ((14 − 2) ÷ 6)² = 2² = 4. The simple mean of the three times (7) ignores the extra weight on the most-likely value.Sample means of size 4 are plotted on a control chart for a process with mean 50 and standard deviation 2. The upper 3-sigma control limit is:
Show answer
Answer: B — 53
For sample means the limits are μ ± 3σ ÷ √n = 50 ± 3 × 2 ÷ 2 = 50 ± 3, so the upper limit is 53. Using σ without dividing by √n (56) applies the limits for individual readings, which are wider than those for means.A tool obeys Taylor's equation V Tⁿ = C with n = 0.25. If the cutting speed is doubled, the tool life becomes:
Show answer
Answer: A — 1/16 of the original
T = (C ÷ V)^(1/n), so doubling V multiplies T by 2^(−4) = 1/16. Halving the life (1/2) assumes n = 1.Yearly demand is 1,200 units, the cost of placing an order is ₹300 and the holding cost is ₹24 per unit per year. The economic order quantity is nearest to:
Show answer
Answer: A — 173 units
EOQ = √(2 × 1,200 × 300 ÷ 24) = √30,000 = 173. Leaving out the 2 gives √15,000 = 122, the near-120 trap.A job of diameter 100 mm is turned at 318 rpm. The cutting speed is nearest to:
Show answer
Answer: A — 100 m/min
V = πDN/1000 = π × 100 × 318/1000 ≈ 99.9 m/min. Forgetting the factor 1000 gives a value in mm/min.In turning at a cutting speed of 100 m/min, a feed of 0.2 mm/rev and a depth of cut of 2 mm, the metal removal rate is:
Show answer
Answer: A — 40,000 mm³/min
MRR = V × f × d with V in mm/min: 1,00,000 × 0.2 × 2 = 40,000 mm³/min. Mixing metres and millimetres changes the answer by a factor of 1,000.A product sells for ₹50 per unit with a variable cost of ₹30 per unit, and fixed costs are ₹60,000. The break-even quantity is:
Show answer
Answer: A — 3,000 units
Contribution per unit is 50 − 30 = ₹20, so break-even = 60,000/20 = 3,000 units. The 1,200 divides by the selling price instead.In a time study the observed time for an element is 2 minutes, the operator's rating is 120% and the allowance is 10% of normal time. The standard time is:
Show answer
Answer: A — 2.64 min
Normal time = 2 × 1.2 = 2.4 min and standard time = 2.4 × 1.10 = 2.64 min. Stopping at 2.4 forgets the allowance.A hole is 50 +0.025/0 mm and a shaft is 50 +0.050/+0.034 mm. The fit is:
Show answer
Answer: A — An interference fit, with a minimum interference of 0.009 mm
The smallest shaft (50.034) is larger than the largest hole (50.025), so there is always interference: minimum 0.034 − 0.025 = 0.009 mm and maximum 0.050 mm.A PERT activity has an optimistic time of 2 days and a pessimistic time of 14 days. Its variance is:
Show answer
Answer: A — 4
Variance = ((P − O)/6)² = (12/6)² = 4. The 2 is the standard deviation.A store uses 20 units a day, the lead time is 10 days and a safety stock of 50 units is kept. The reorder point is:
Show answer
Answer: A — 250 units
Reorder point = demand during lead time + safety stock = 20 × 10 + 50 = 250 units. The 200 omits the safety stock.A job is turned at 300 rpm with a feed of 0.2 mm per revolution. The feed rate is:
Show answer
Answer: B — 60 mm/min
Feed rate = feed per revolution × rpm = 0.2 × 300 = 60 mm/min. Dividing 300 by 0.2 gives the tempting 1,500.A shaft is specified as 25 +0.021/+0.008 mm. The tolerance on the shaft is:
Show answer
Answer: B — 0.013 mm
Tolerance = upper limit − lower limit = 0.021 − 0.008 = 0.013 mm. Adding the deviations (0.029) is the tempting slip.A process has specification limits that are 12 units apart and a standard deviation of 1.5 units. The process capability index Cp is:
Show answer
Answer: A — 1.33
Cp = (USL − LSL) ÷ 6σ = 12 ÷ 9 = 1.33. Dividing by σ alone gives the tempting 8, and 0.75 is the inverted ratio.In a time study the observed time is 1.5 minutes, the operator's rating is 80% and the allowance is 10% of normal time. The standard time is:
Show answer
Answer: A — 1.32 min
Normal time = 1.5 × 0.8 = 1.2 min; standard time = 1.2 × 1.10 = 1.32 min. Applying the allowance to the observed time and ignoring the rating gives 1.65, the tempting slip.Annual demand is 900 units, the ordering cost is ₹50 an order and the holding cost is ₹2 per unit per year. The economic order quantity is about:
Show answer
Answer: B — 212 units
EOQ = √(2DS ÷ H) = √(2 × 900 × 50 ÷ 2) = √45,000 = 212. Check: 212 × 212 = 44,944. Taking half the demand (450) is the tempting slip.In up (conventional) milling, the cutter rotates:
Show answer
Answer: C — Against the direction of feed of the workpiece
In up milling the cutter teeth move against the feed, so the chip starts thin and grows thick. Rotation with the feed is climb (down) milling, the tempting reversal.Assertion (A): According to Taylor's tool-life equation, a higher cutting speed shortens the tool life.
Reason (R): The heat generated at the tool–chip interface rises with the cutting speed.
Which one of the following is correct?Show answer
Answer: A — Both A and R are true, and R is the correct explanation of A
V·Tⁿ = C means life falls as speed rises, and the main cause is greater heat and wear at the cutting edge, so R explains A. Saying tool life rises with speed is the tempting reversal.Arrange these steps of method study in the usual order:
1. Examine the recorded facts critically
2. Select the work to be studied
3. Develop the improved method
4. Record the existing methodShow answer
Answer: C — 2, 4, 1, 3
The sequence is select, record, examine, develop (then define, install and maintain). Examining before recording is the tempting slip, since there is nothing to examine until the facts are recorded.