Civil Engineering Basics: Surveying, Building Materials, Concrete, Soil and Water
2. Building materials: bricks, cement, aggregates and steel
A modular brick is 19 × 9 × 9 cm, becoming 20 × 10 × 10 cm with mortar, so one cubic metre of brickwork holds 1 ÷ (0.2 × 0.1 × 0.1) = 500 bricks; without mortar, 1 ÷ (0.19 × 0.09 × 0.09) = about 650. A good brick is well burnt, uniformly red, rings when struck, is not scratched by a nail easily, and absorbs not more than about 20% of its weight in water in 24 hours. Cement is made by burning limestone and clay and grinding the clinker with a little gypsum, which controls the setting time. Ordinary Portland cement is graded 33, 43 and 53 by its 28-day compressive strength in MPa; the initial setting time is not less than 30 minutes and the final setting time not more than 10 hours. The bag is 50 kg, and its density is about 1,440 kg/m³. Aggregates are coarse (retained on a 4.75 mm sieve) and fine (sand, passing it); well-graded aggregate gives a denser, stronger concrete.
| Material | Key points |
|---|---|
| Lime | Quicklime slakes with water to hydrated lime; hydraulic lime sets under water; used in mortar and plaster |
| Mortar | A mix of binder (cement or lime) and sand with water: cement mortar 1 : 4 or 1 : 6 for brickwork and 1 : 3 for plaster are typical |
| Timber and steel | Timber is seasoned to remove moisture before use; structural steel is mild steel; reinforcement bars are high-strength deformed bars of grades such as Fe 415 and Fe 500 (the number is the yield strength in MPa) |
| Bitumen and ballast (railway) | Bitumen binds road surfacing; track ballast of crushed stone under the sleepers drains water and spreads the load |
A modular brick is 19 × 9 × 9 cm, becoming 20 × 10 × 10 cm with mortar, so one cubic metre of brickwork holds 1 ÷ (0.2 × 0.1 × 0.1) = 500 bricks; without mortar, 1 ÷ (0.19 × 0.09 × 0.09) =…
3. Concrete and reinforced concrete
Concrete is cement, fine aggregate, coarse aggregate and water. The grade is named by the characteristic compressive strength at 28 days in MPa, so M20 has 20 MPa; the nominal mix for M20 is 1 : 1.5 : 3 (cement : sand : coarse aggregate by volume). A cubic metre of wet concrete needs about 1.54 cubic metres of dry materials, because the voids fill; so cement per cubic metre of M20 is 1 ÷ (1 + 1.5 + 3) × 1.54 = 0.28 m³, which at 1,440 kg/m³ is 403 kg, about 8 bags of 50 kg. The water-cement ratio is the main factor in strength: a lower ratio gives higher strength, provided the concrete can still be compacted. Workability is tested by the slump test (slump of a concrete cone, in mm); compressive strength by cubes of 150 mm cured in water for 28 days. Curing, keeping the concrete moist for at least 7 days (longer for some cements), prevents cracking and gives strength.
Reinforced cement concrete (RCC) combines concrete, strong in compression and weak in tension, with steel, strong in tension, and the two work together because they bond and have almost the same coefficient of thermal expansion. In a beam the steel is placed on the tension side, at the bottom of a simply supported beam and at the top over supports of a cantilever; stirrups resist shear. A slab may be one-way or two-way; a column carries compression with main bars and ties; a footing spreads the column load on the soil. Prestressed concrete puts the concrete in compression before loading, which suits long spans such as railway bridges. Concrete cover protects the steel from corrosion.
Concrete is cement, fine aggregate, coarse aggregate and water. The grade is named by the characteristic compressive strength at 28 days in MPa, so M20 has 20 MPa; the nominal mix for M20…
4. Soil, foundations and flow of water
Soil is a three-phase system of solids, water and air. The void ratio e = volume of voids ÷ volume of solids and the porosity n = volume of voids ÷ total volume, linked by n = e ÷ (1 + e): e = 0.6 gives n = 0.375, or 37.5%. The water content is the mass of water ÷ mass of solids. Soils are coarse-grained (gravel, sand: strong, drain freely) or fine-grained (silt, clay: cohesive, retain water, swell and shrink). The Atterberg limits are the liquid limit, the plastic limit and the shrinkage limit; plasticity index = liquid limit − plastic limit. The bearing capacity is the pressure a soil can carry; a shallow foundation (isolated footing, strip, raft) rests near the surface, a deep foundation (pile, well, caisson) reaches firmer strata, as bridge foundations on a river bed do. Compaction densifies a soil by rolling, and is vital for railway embankments.
Fluid flow in open channels and pipes uses the discharge Q = A × V: a channel 2 m wide and 1 m deep with a mean velocity of 1.5 m/s carries 2 × 1 × 1.5 = 3 m³/s. Flow in an open channel is estimated by Manning's or Chezy's formula, and in a pipe the loss of head is by the Darcy-Weisbach equation. Hydrology deals with rainfall (measured by a rain gauge), runoff and floods; irrigation works include a dam, barrage (gates control the flow), weir and canal, and a culvert or bridge carries a road or railway over a stream, which is why waterway calculations decide the bridge's span. Water supply involves sources, intake, treatment (sedimentation, filtration, chlorination for disinfection), storage and distribution; sewage is treated by screening, settling and biological processes.
Soil is a three-phase system of solids, water and air. The void ratio e = volume of voids ÷ volume of solids and the porosity n = volume of voids ÷ total volume, linked by n = e ÷ (1 + e)…
Worked Drills: Back Bearings, Levelling, Trapezoidal Area, Porosity and Cement Tests
Civil numericals reduce to small rules. Back bearing = forward bearing ± 180° (add if the forward bearing is below 180°, subtract if above). In levelling, rise = backsight − foresight and a negative value is a fall. Trapezoidal rule: area = (d/2)[first + last + 2(sum of the rest)]. For soils, void ratio e = n/(1 − n) where n is porosity. For cement, initial setting time must be at least 30 minutes and final setting time at most 600 minutes for ordinary Portland cement.
| Question | Working | Answer |
|---|---|---|
| Forward bearing 250° | 250° − 180° | 70° |
| BS 1.5 m, FS 2.1 m from RL 100 m | fall 0.6 m | RL 99.4 m |
| Offsets 2, 3, 4, 5 m at 10 m spacing | (10/2)[2 + 5 + 2(3 + 4)] | 105 m² |
| Porosity 40% | 0.4/0.6 | e = 0.667 |
Civil numericals reduce to small rules. Back bearing = forward bearing ± 180° (add if the forward bearing is below 180°, subtract if above). In levelling, rise = backsight − foresight and a…
Key takeaways
- Chain surveying suits small open areas; Gunter's chain is 66 ft of 100 links and 10 square chains make an acre; back bearing = forward bearing ± 180°.
- Levelling: HI = RL + BS and RL = HI − FS; check Σ BS − Σ FS = last RL − first RL; close contours mean steep ground.
- A brick with mortar is 20 × 10 × 10 cm, so 500 bricks per cubic metre of masonry; cement is graded 33, 43, 53 by 28-day strength, with initial set not under 30 minutes and final set within 10 hours.
- M20 is a 1 : 1.5 : 3 nominal mix with 20 MPa at 28 days; about 8 bags of cement per cubic metre; lower water-cement ratio gives higher strength; slump tests workability and cubes test strength.
- In RCC, steel goes on the tension face; stirrups resist shear; prestressed concrete suits long spans like railway bridges.
- Porosity n = e ÷ (1 + e); plasticity index = liquid limit − plastic limit; discharge Q = A × V; chlorination disinfects water.
Practice questions (25)
Attempt each one before opening the answer. Every explanation names the tempting wrong option as well as the right one, because that is where marks are lost.
The back bearing of a line whose forward bearing is 65° is:
Show answer
Answer: D — 245°
The back bearing differs from the forward bearing by 180°, so 65° + 180° = 245°. When the forward bearing exceeds 180° one subtracts instead (250° gives 70°).The number of bricks in one cubic metre of brickwork, for a modular brick of 20 × 10 × 10 cm including mortar, is:
Show answer
Answer: B — 500
One brick with mortar occupies 0.2 × 0.1 × 0.1 = 0.002 m³, so a cubic metre holds 1 ÷ 0.002 = 500. About 650 would be the count for 19 × 9 × 9 cm bricks without mortar.In a reinforced concrete simply supported beam under a downward load, the main steel is placed:
Show answer
Answer: D — At the bottom, in tension
A sagging beam stretches at the bottom, where concrete cracks easily, so the steel goes there. Concrete itself is strong in compression at the top.
Show the other 22 questions
A level set on a benchmark of RL 100.000 m reads a backsight of 1.250 m. A foresight of 0.850 m is then taken on a new point. The RL of the new point is:
Show answer
Answer: A — 100.400 m
HI = 100.000 + 1.250 = 101.250 m, and RL = HI − FS = 101.250 − 0.850 = 100.400 m. The 101.250 m is the height of instrument, not the point's level.For a given workable concrete, increasing the water-cement ratio generally:
Show answer
Answer: C — Decreases the strength
Extra water leaves voids when it dries out and dilutes the cement paste, so strength falls as the water-cement ratio rises, even though the mix becomes easier to place.The nominal mix of M20 concrete by volume (cement : sand : coarse aggregate) is:
Show answer
Answer: B — 1 : 1.5 : 3
M20 uses 1 : 1.5 : 3. M15 is 1 : 2 : 4 and M10 is 1 : 3 : 6, with M25 richer at 1 : 1 : 2.A soil has a void ratio of 0.6. Its porosity is:
Show answer
Answer: A — 0.375
Porosity n = e ÷ (1 + e) = 0.6 ÷ 1.6 = 0.375, or 37.5%. The void ratio is voids to solids, the porosity voids to total volume, so the two are never equal.About how many 50 kg bags of cement does one cubic metre of M20 concrete (1 : 1.5 : 3 mix, dry volume 1.54 times wet, cement density 1,440 kg/m³) need?
Show answer
Answer: D — 8
Cement volume = 1.54 × 1 ÷ 5.5 = 0.28 m³, which is 0.28 × 1,440 ≈ 403 kg, or about 8 bags of 50 kg.The forward bearing of a line is 250°. Its back bearing is:
Show answer
Answer: A — 70°
The forward bearing exceeds 180°, so the back bearing = 250° − 180° = 70°. Adding 180° (430°) is out of range, and 110° is 360° − 250°.In levelling, a backsight of 1.5 m is taken on a point of reduced level 100.000 m and a foresight of 2.1 m on the next point. The reduced level of the next point is:
Show answer
Answer: A — 99.400 m
Height of instrument = 100 + 1.5 = 101.5, and the next RL = 101.5 − 2.1 = 99.4 m, a fall of 0.6 m. A higher foresight reading means lower ground.The grade designation M25 of concrete means that:
Show answer
Answer: A — The characteristic compressive strength of a 150 mm cube at 28 days is 25 N/mm²
The number in M25 is the characteristic cube strength in N/mm² after 28 days of curing, and M stands for mix. It does not give the proportions, cement content or slump.A soil has a porosity of 40%. Its void ratio is:
Show answer
Answer: A — 0.667
e = n/(1 − n) = 0.4/0.6 = 0.667. The value 0.4 is the porosity itself, and 0.6 is the solid fraction.Offsets of 2, 3, 4 and 5 m are measured at 10 m intervals from a chain line to a boundary. The area between the chain line and the boundary by the trapezoidal rule is:
Show answer
Answer: A — 105 m²
Area = (10/2)[2 + 5 + 2(3 + 4)] = 5 × 21 = 105 m². Averaging all four offsets and multiplying by 30 m gives 105 too, but multiplying by 40 m (140) uses the wrong length.For ordinary Portland cement, the initial setting time and the final setting time should be, respectively, at least and at most:
Show answer
Answer: A — 30 minutes and 600 minutes
Initial setting must be at least 30 minutes so that there is time to mix, place and compact the concrete, and final setting at most 600 minutes (10 hours). The other pairs belong to different materials or are invented.The slump test on fresh concrete is used to measure its:
Show answer
Answer: A — Workability
The slump cone test gives a measure of workability, the ease of mixing, placing and compacting. Strength is tested on hardened cubes, and setting time and fineness are cement tests.Offsets of 2 m, 4 m and 6 m are taken at 5 m intervals from a chain line to a curved boundary. By Simpson's rule the area is:
Show answer
Answer: B — 40 m²
Area = (h ÷ 3)[y₀ + 4y₁ + y₂] = (5 ÷ 3)(2 + 16 + 6) = (5 ÷ 3) × 24 = 40 m². Dropping the weight 4 on the middle ordinate and using the sum 2 + 4 + 6 gives (5 ÷ 3) × 12 = 20, the tempting slip.The actual size of a modular brick, without mortar, is:
Show answer
Answer: D — 19 × 9 × 9 cm
The modular brick measures 19 × 9 × 9 cm and, with 1 cm of mortar, 20 × 10 × 10 cm nominal. The nominal size is the tempting answer.Under IS 456, the minimum period for which concrete made with ordinary Portland cement must be kept moist (cured) is:
Show answer
Answer: B — 7 days
IS 456 calls for at least 7 days of curing for ordinary Portland cement concrete, and longer for blended cements. 28 days is the strength-test age, the tempting figure.A backsight of 2.345 m is taken on a point, then a foresight of 1.865 m on the next point. The next point is:
Show answer
Answer: B — 0.480 m higher
A rise = backsight − foresight = 2.345 − 1.865 = +0.480 m, since the smaller foresight means higher ground. Treating a smaller reading as lower ground is the tempting error.A line has a whole circle bearing of 135°. Its reduced (quadrantal) bearing is:
Show answer
Answer: C — S 45° E
A bearing between 90° and 180° lies in the south-east quadrant, so R.B. = 180° − 135° = S 45° E. N 45° E would be a bearing of 45°, which is the tempting first-quadrant slip.A soil has a liquid limit of 45% and a plastic limit of 25%. Its plasticity index is:
Show answer
Answer: C — 20%
Plasticity index = liquid limit − plastic limit = 45 − 25 = 20%. Adding the limits (70%) is the tempting slip, and 1.8 is the liquid limit ratio.A soil has a coefficient of permeability of 0.01 cm/s and a hydraulic gradient of 0.5. By Darcy's law the discharge velocity is:
Show answer
Answer: A — 0.005 cm/s
v = k i = 0.01 × 0.5 = 0.005 cm/s. Check: halving the gradient halves the velocity. Dividing k by i gives the tempting 0.02.The designation Fe 500 for a reinforcing bar means that its:
Show answer
Answer: B — Characteristic yield strength is 500 N/mm²
In Fe 500, Fe means iron and 500 is the minimum yield strength in N/mm². Calling it the ultimate strength is the tempting slip.Assertion (A): A higher water-cement ratio reduces the strength of concrete.
Reason (R): The extra water evaporates and leaves voids in the hardened concrete.
Which one of the following is correct?Show answer
Answer: A — Both A and R are true, and R is the correct explanation of A
Only about 0.25–0.3 of the cement weight is needed for hydration; extra water leaves capillary voids, so R explains A. Saying more water makes it stronger because it hydrates better is the tempting error.The volume of earth to be excavated for a trench 20 m long, 4 m wide and 1.5 m deep is:
Show answer
Answer: D — 120 m³
Volume = 20 × 4 × 1.5 = 120 m³. Check: 20 × 4 = 80 m² of plan area, times 1.5 m. Leaving out the depth gives the tempting 80.