Civil engineering carries real weight on the railways, which maintain track, bridges and buildings, and a Junior Engineer (civil) paper rests on a common core: surveying and levelling, building materials, concrete and reinforced concrete, soil and foundations, and water flow. This chapter teaches that core at the depth of a first diploma course, with a worked figure for each calculation, recomputed by script. It is one chapter for the civil discipline, not a bank for the posts, and it does not mirror a notice: the Boards' technical lists were not read against it. Specifications that codes revise (permissible stresses, grades in current use) are described in outline, and a candidate should check the latest code.
Overview

1. Surveying: chain, compass and levelling

1 min read · 2 parts

Surveying fixes the relative positions of points on the ground. Chain surveying measures lengths with a chain or tape and is suited to small, open, flat areas; metric chains are 20 m and 30 m, and the older Gunter's chain is 66 ft with 100 links, so 10 square chains make an acre (66 × 66 × 10 = 43,560 sq ft). Compass surveying measures horizontal angles as bearings, the angle from the north. A whole circle bearing (WCB) runs 0° to 360° clockwise from north; a quadrant bearing is read from north or south toward east or west (WCB 135° is S 45° E). The back bearing differs from the forward bearing by 180°: a forward bearing of 65° has a back bearing of 245°, and 250° has 70°. Local attraction (a steel object near the compass) is detected when the two bearings of a line do not differ by exactly 180°.

Levelling finds differences of height. A level is set up and a staff read. The height of instrument (HI) = RL of the benchmark + backsight (BS), and the RL of a point = HI − foresight (FS). With a benchmark of RL 100.000 m and a backsight of 1.250 m, HI = 101.250 m; a foresight of 0.850 m on a new point gives RL = 100.400 m, a rise of 0.400 m (the staff reading fell). A check on the arithmetic is Σ BS − Σ FS = last RL − first RL. Levelling methods are the height-of-collimation method (above) and the rise and fall method. A contour joins points of equal elevation; closely spaced contours mean a steep slope, widely spaced ones a gentle slope, and contours never cross except at a vertical cliff or overhang.

Surveying fixes the relative positions of points on the ground. Chain surveying measures lengths with a chain or tape and is suited to small, open, flat areas; metric chains are 20 m and 30…

2. Building materials: bricks, cement, aggregates and steel

1 min read · 1 part

A modular brick is 19 × 9 × 9 cm, becoming 20 × 10 × 10 cm with mortar, so one cubic metre of brickwork holds 1 ÷ (0.2 × 0.1 × 0.1) = 500 bricks; without mortar, 1 ÷ (0.19 × 0.09 × 0.09) = about 650. A good brick is well burnt, uniformly red, rings when struck, is not scratched by a nail easily, and absorbs not more than about 20% of its weight in water in 24 hours. Cement is made by burning limestone and clay and grinding the clinker with a little gypsum, which controls the setting time. Ordinary Portland cement is graded 33, 43 and 53 by its 28-day compressive strength in MPa; the initial setting time is not less than 30 minutes and the final setting time not more than 10 hours. The bag is 50 kg, and its density is about 1,440 kg/m³. Aggregates are coarse (retained on a 4.75 mm sieve) and fine (sand, passing it); well-graded aggregate gives a denser, stronger concrete.

Materials in brief
MaterialKey points
LimeQuicklime slakes with water to hydrated lime; hydraulic lime sets under water; used in mortar and plaster
MortarA mix of binder (cement or lime) and sand with water: cement mortar 1 : 4 or 1 : 6 for brickwork and 1 : 3 for plaster are typical
Timber and steelTimber is seasoned to remove moisture before use; structural steel is mild steel; reinforcement bars are high-strength deformed bars of grades such as Fe 415 and Fe 500 (the number is the yield strength in MPa)
Bitumen and ballast (railway)Bitumen binds road surfacing; track ballast of crushed stone under the sleepers drains water and spreads the load

A modular brick is 19 × 9 × 9 cm, becoming 20 × 10 × 10 cm with mortar, so one cubic metre of brickwork holds 1 ÷ (0.2 × 0.1 × 0.1) = 500 bricks; without mortar, 1 ÷ (0.19 × 0.09 × 0.09) =…

3. Concrete and reinforced concrete

2 min read · 3 parts

Concrete is cement, fine aggregate, coarse aggregate and water. The grade is named by the characteristic compressive strength at 28 days in MPa, so M20 has 20 MPa; the nominal mix for M20 is 1 : 1.5 : 3 (cement : sand : coarse aggregate by volume). A cubic metre of wet concrete needs about 1.54 cubic metres of dry materials, because the voids fill; so cement per cubic metre of M20 is 1 ÷ (1 + 1.5 + 3) × 1.54 = 0.28 m³, which at 1,440 kg/m³ is 403 kg, about 8 bags of 50 kg. The water-cement ratio is the main factor in strength: a lower ratio gives higher strength, provided the concrete can still be compacted. Workability is tested by the slump test (slump of a concrete cone, in mm); compressive strength by cubes of 150 mm cured in water for 28 days. Curing, keeping the concrete moist for at least 7 days (longer for some cements), prevents cracking and gives strength.

Reinforced cement concrete (RCC) combines concrete, strong in compression and weak in tension, with steel, strong in tension, and the two work together because they bond and have almost the same coefficient of thermal expansion. In a beam the steel is placed on the tension side, at the bottom of a simply supported beam and at the top over supports of a cantilever; stirrups resist shear. A slab may be one-way or two-way; a column carries compression with main bars and ties; a footing spreads the column load on the soil. Prestressed concrete puts the concrete in compression before loading, which suits long spans such as railway bridges. Concrete cover protects the steel from corrosion.

⚠️ Exam trap: water and tension face
A higher water-cement ratio makes concrete easier to place but WEAKER and more porous: more water is not harmless. And steel goes where the concrete would crack, which is the tension face: the bottom of a simply supported beam, the top of a cantilever.

Concrete is cement, fine aggregate, coarse aggregate and water. The grade is named by the characteristic compressive strength at 28 days in MPa, so M20 has 20 MPa; the nominal mix for M20…

4. Soil, foundations and flow of water

1 min read · 2 parts

Soil is a three-phase system of solids, water and air. The void ratio e = volume of voids ÷ volume of solids and the porosity n = volume of voids ÷ total volume, linked by n = e ÷ (1 + e): e = 0.6 gives n = 0.375, or 37.5%. The water content is the mass of water ÷ mass of solids. Soils are coarse-grained (gravel, sand: strong, drain freely) or fine-grained (silt, clay: cohesive, retain water, swell and shrink). The Atterberg limits are the liquid limit, the plastic limit and the shrinkage limit; plasticity index = liquid limit − plastic limit. The bearing capacity is the pressure a soil can carry; a shallow foundation (isolated footing, strip, raft) rests near the surface, a deep foundation (pile, well, caisson) reaches firmer strata, as bridge foundations on a river bed do. Compaction densifies a soil by rolling, and is vital for railway embankments.

Fluid flow in open channels and pipes uses the discharge Q = A × V: a channel 2 m wide and 1 m deep with a mean velocity of 1.5 m/s carries 2 × 1 × 1.5 = 3 m³/s. Flow in an open channel is estimated by Manning's or Chezy's formula, and in a pipe the loss of head is by the Darcy-Weisbach equation. Hydrology deals with rainfall (measured by a rain gauge), runoff and floods; irrigation works include a dam, barrage (gates control the flow), weir and canal, and a culvert or bridge carries a road or railway over a stream, which is why waterway calculations decide the bridge's span. Water supply involves sources, intake, treatment (sedimentation, filtration, chlorination for disinfection), storage and distribution; sewage is treated by screening, settling and biological processes.

Soil is a three-phase system of solids, water and air. The void ratio e = volume of voids ÷ volume of solids and the porosity n = volume of voids ÷ total volume, linked by n = e ÷ (1 + e)…

Worked Drills: Back Bearings, Levelling, Trapezoidal Area, Porosity and Cement Tests

1 min read · 2 parts

Civil numericals reduce to small rules. Back bearing = forward bearing ± 180° (add if the forward bearing is below 180°, subtract if above). In levelling, rise = backsight − foresight and a negative value is a fall. Trapezoidal rule: area = (d/2)[first + last + 2(sum of the rest)]. For soils, void ratio e = n/(1 − n) where n is porosity. For cement, initial setting time must be at least 30 minutes and final setting time at most 600 minutes for ordinary Portland cement.

Worked values
QuestionWorkingAnswer
Forward bearing 250°250° − 180°70°
BS 1.5 m, FS 2.1 m from RL 100 mfall 0.6 mRL 99.4 m
Offsets 2, 3, 4, 5 m at 10 m spacing(10/2)[2 + 5 + 2(3 + 4)]105 m²
Porosity 40%0.4/0.6e = 0.667
🧠 Trapezoidal rule, checked by two routes
Offsets 2, 3, 4 and 5 m at 10 m intervals give three strips. Route one: (10/2)[2 + 5 + 2(3 + 4)] = 5 × 21 = 105 m². Route two: sum the three trapezoids, 10 × (2 + 3)/2 + 10 × (3 + 4)/2 + 10 × (4 + 5)/2 = 25 + 35 + 45 = 105 m² ✓.

Civil numericals reduce to small rules. Back bearing = forward bearing ± 180° (add if the forward bearing is below 180°, subtract if above). In levelling, rise = backsight − foresight and a…

Key takeaways

  • Chain surveying suits small open areas; Gunter's chain is 66 ft of 100 links and 10 square chains make an acre; back bearing = forward bearing ± 180°.
  • Levelling: HI = RL + BS and RL = HI − FS; check Σ BS − Σ FS = last RL − first RL; close contours mean steep ground.
  • A brick with mortar is 20 × 10 × 10 cm, so 500 bricks per cubic metre of masonry; cement is graded 33, 43, 53 by 28-day strength, with initial set not under 30 minutes and final set within 10 hours.
  • M20 is a 1 : 1.5 : 3 nominal mix with 20 MPa at 28 days; about 8 bags of cement per cubic metre; lower water-cement ratio gives higher strength; slump tests workability and cubes test strength.
  • In RCC, steel goes on the tension face; stirrups resist shear; prestressed concrete suits long spans like railway bridges.
  • Porosity n = e ÷ (1 + e); plasticity index = liquid limit − plastic limit; discharge Q = A × V; chlorination disinfects water.

Practice questions (25)

Attempt each one before opening the answer. Every explanation names the tempting wrong option as well as the right one, because that is where marks are lost.

  1. The back bearing of a line whose forward bearing is 65° is:

    1. 295°
    2. 25°
    3. 115°
    4. 245°
    Show answer

    Answer: D — 245°

    The back bearing differs from the forward bearing by 180°, so 65° + 180° = 245°. When the forward bearing exceeds 180° one subtracts instead (250° gives 70°).
  2. The number of bricks in one cubic metre of brickwork, for a modular brick of 20 × 10 × 10 cm including mortar, is:

    1. 100
    2. 500
    3. 650
    4. 1,000
    Show answer

    Answer: B — 500

    One brick with mortar occupies 0.2 × 0.1 × 0.1 = 0.002 m³, so a cubic metre holds 1 ÷ 0.002 = 500. About 650 would be the count for 19 × 9 × 9 cm bricks without mortar.
  3. In a reinforced concrete simply supported beam under a downward load, the main steel is placed:

    1. At the neutral axis
    2. Only in the stirrups
    3. At the top, in compression
    4. At the bottom, in tension
    Show answer

    Answer: D — At the bottom, in tension

    A sagging beam stretches at the bottom, where concrete cracks easily, so the steel goes there. Concrete itself is strong in compression at the top.
Show the other 22 questions
  1. A level set on a benchmark of RL 100.000 m reads a backsight of 1.250 m. A foresight of 0.850 m is then taken on a new point. The RL of the new point is:

    1. 100.400 m
    2. 101.250 m
    3. 102.100 m
    4. 99.600 m
    Show answer

    Answer: A — 100.400 m

    HI = 100.000 + 1.250 = 101.250 m, and RL = HI − FS = 101.250 − 0.850 = 100.400 m. The 101.250 m is the height of instrument, not the point's level.
  2. For a given workable concrete, increasing the water-cement ratio generally:

    1. Doubles the setting time
    2. Increases the strength
    3. Decreases the strength
    4. Leaves the strength unchanged
    Show answer

    Answer: C — Decreases the strength

    Extra water leaves voids when it dries out and dilutes the cement paste, so strength falls as the water-cement ratio rises, even though the mix becomes easier to place.
  3. The nominal mix of M20 concrete by volume (cement : sand : coarse aggregate) is:

    1. 1 : 1 : 2
    2. 1 : 1.5 : 3
    3. 1 : 2 : 4
    4. 1 : 3 : 6
    Show answer

    Answer: B — 1 : 1.5 : 3

    M20 uses 1 : 1.5 : 3. M15 is 1 : 2 : 4 and M10 is 1 : 3 : 6, with M25 richer at 1 : 1 : 2.
  4. A soil has a void ratio of 0.6. Its porosity is:

    1. 0.375
    2. 0.4
    3. 1.6
    4. 0.6
    Show answer

    Answer: A — 0.375

    Porosity n = e ÷ (1 + e) = 0.6 ÷ 1.6 = 0.375, or 37.5%. The void ratio is voids to solids, the porosity voids to total volume, so the two are never equal.
  5. About how many 50 kg bags of cement does one cubic metre of M20 concrete (1 : 1.5 : 3 mix, dry volume 1.54 times wet, cement density 1,440 kg/m³) need?

    1. 12
    2. 16
    3. 4
    4. 8
    Show answer

    Answer: D — 8

    Cement volume = 1.54 × 1 ÷ 5.5 = 0.28 m³, which is 0.28 × 1,440 ≈ 403 kg, or about 8 bags of 50 kg.
  6. The forward bearing of a line is 250°. Its back bearing is:

    1. 70°
    2. 430°
    3. 110°
    4. 160°
    Show answer

    Answer: A — 70°

    The forward bearing exceeds 180°, so the back bearing = 250° − 180° = 70°. Adding 180° (430°) is out of range, and 110° is 360° − 250°.
  7. In levelling, a backsight of 1.5 m is taken on a point of reduced level 100.000 m and a foresight of 2.1 m on the next point. The reduced level of the next point is:

    1. 99.400 m
    2. 100.600 m
    3. 101.400 m
    4. 98.400 m
    Show answer

    Answer: A — 99.400 m

    Height of instrument = 100 + 1.5 = 101.5, and the next RL = 101.5 − 2.1 = 99.4 m, a fall of 0.6 m. A higher foresight reading means lower ground.
  8. The grade designation M25 of concrete means that:

    1. The characteristic compressive strength of a 150 mm cube at 28 days is 25 N/mm²
    2. The mix ratio is 1 : 2 : 5
    3. The concrete contains 25 kg of cement
    4. The slump is 25 mm
    Show answer

    Answer: A — The characteristic compressive strength of a 150 mm cube at 28 days is 25 N/mm²

    The number in M25 is the characteristic cube strength in N/mm² after 28 days of curing, and M stands for mix. It does not give the proportions, cement content or slump.
  9. A soil has a porosity of 40%. Its void ratio is:

    1. 0.667
    2. 0.4
    3. 1.5
    4. 0.6
    Show answer

    Answer: A — 0.667

    e = n/(1 − n) = 0.4/0.6 = 0.667. The value 0.4 is the porosity itself, and 0.6 is the solid fraction.
  10. Offsets of 2, 3, 4 and 5 m are measured at 10 m intervals from a chain line to a boundary. The area between the chain line and the boundary by the trapezoidal rule is:

    1. 105 m²
    2. 140 m²
    3. 70 m²
    4. 120 m²
    Show answer

    Answer: A — 105 m²

    Area = (10/2)[2 + 5 + 2(3 + 4)] = 5 × 21 = 105 m². Averaging all four offsets and multiplying by 30 m gives 105 too, but multiplying by 40 m (140) uses the wrong length.
  11. For ordinary Portland cement, the initial setting time and the final setting time should be, respectively, at least and at most:

    1. 30 minutes and 600 minutes
    2. 60 minutes and 300 minutes
    3. 10 minutes and 30 minutes
    4. 30 minutes and 60 minutes
    Show answer

    Answer: A — 30 minutes and 600 minutes

    Initial setting must be at least 30 minutes so that there is time to mix, place and compact the concrete, and final setting at most 600 minutes (10 hours). The other pairs belong to different materials or are invented.
  12. The slump test on fresh concrete is used to measure its:

    1. Workability
    2. Compressive strength
    3. Setting time
    4. Fineness
    Show answer

    Answer: A — Workability

    The slump cone test gives a measure of workability, the ease of mixing, placing and compacting. Strength is tested on hardened cubes, and setting time and fineness are cement tests.
  13. Offsets of 2 m, 4 m and 6 m are taken at 5 m intervals from a chain line to a curved boundary. By Simpson's rule the area is:

    1. 50 m²
    2. 40 m²
    3. 60 m²
    4. 45 m²
    Show answer

    Answer: B — 40 m²

    Area = (h ÷ 3)[y₀ + 4y₁ + y₂] = (5 ÷ 3)(2 + 16 + 6) = (5 ÷ 3) × 24 = 40 m². Dropping the weight 4 on the middle ordinate and using the sum 2 + 4 + 6 gives (5 ÷ 3) × 12 = 20, the tempting slip.
  14. The actual size of a modular brick, without mortar, is:

    1. 22.5 × 11.25 × 7.5 cm
    2. 25 × 12 × 8 cm
    3. 20 × 10 × 10 cm
    4. 19 × 9 × 9 cm
    Show answer

    Answer: D — 19 × 9 × 9 cm

    The modular brick measures 19 × 9 × 9 cm and, with 1 cm of mortar, 20 × 10 × 10 cm nominal. The nominal size is the tempting answer.
  15. Under IS 456, the minimum period for which concrete made with ordinary Portland cement must be kept moist (cured) is:

    1. 28 days
    2. 7 days
    3. 3 days
    4. 1 day
    Show answer

    Answer: B — 7 days

    IS 456 calls for at least 7 days of curing for ordinary Portland cement concrete, and longer for blended cements. 28 days is the strength-test age, the tempting figure.
  16. A backsight of 2.345 m is taken on a point, then a foresight of 1.865 m on the next point. The next point is:

    1. 0.480 m lower
    2. 0.480 m higher
    3. 4.210 m higher
    4. 0.480 m, level
    Show answer

    Answer: B — 0.480 m higher

    A rise = backsight − foresight = 2.345 − 1.865 = +0.480 m, since the smaller foresight means higher ground. Treating a smaller reading as lower ground is the tempting error.
  17. A line has a whole circle bearing of 135°. Its reduced (quadrantal) bearing is:

    1. S 45° W
    2. N 45° E
    3. S 45° E
    4. N 45° W
    Show answer

    Answer: C — S 45° E

    A bearing between 90° and 180° lies in the south-east quadrant, so R.B. = 180° − 135° = S 45° E. N 45° E would be a bearing of 45°, which is the tempting first-quadrant slip.
  18. A soil has a liquid limit of 45% and a plastic limit of 25%. Its plasticity index is:

    1. 25%
    2. 70%
    3. 20%
    4. 1.8
    Show answer

    Answer: C — 20%

    Plasticity index = liquid limit − plastic limit = 45 − 25 = 20%. Adding the limits (70%) is the tempting slip, and 1.8 is the liquid limit ratio.
  19. A soil has a coefficient of permeability of 0.01 cm/s and a hydraulic gradient of 0.5. By Darcy's law the discharge velocity is:

    1. 0.005 cm/s
    2. 0.5 cm/s
    3. 0.01 cm/s
    4. 0.02 cm/s
    Show answer

    Answer: A — 0.005 cm/s

    v = k i = 0.01 × 0.5 = 0.005 cm/s. Check: halving the gradient halves the velocity. Dividing k by i gives the tempting 0.02.
  20. The designation Fe 500 for a reinforcing bar means that its:

    1. Diameter is 500 mm
    2. Characteristic yield strength is 500 N/mm²
    3. Length is 500 cm
    4. Weight is 500 kg per metre
    Show answer

    Answer: B — Characteristic yield strength is 500 N/mm²

    In Fe 500, Fe means iron and 500 is the minimum yield strength in N/mm². Calling it the ultimate strength is the tempting slip.
  21. Assertion (A): A higher water-cement ratio reduces the strength of concrete.
    Reason (R): The extra water evaporates and leaves voids in the hardened concrete.
    Which one of the following is correct?

    1. Both A and R are true, and R is the correct explanation of A
    2. Both A and R are true, but R is not the correct explanation of A
    3. A is true, but R is false
    4. A is false, but R is true
    Show answer

    Answer: A — Both A and R are true, and R is the correct explanation of A

    Only about 0.25–0.3 of the cement weight is needed for hydration; extra water leaves capillary voids, so R explains A. Saying more water makes it stronger because it hydrates better is the tempting error.
  22. The volume of earth to be excavated for a trench 20 m long, 4 m wide and 1.5 m deep is:

    1. 80 m³
    2. 240 m³
    3. 30 m³
    4. 120 m³
    Show answer

    Answer: D — 120 m³

    Volume = 20 × 4 × 1.5 = 120 m³. Check: 20 × 4 = 80 m² of plan area, times 1.5 m. Leaving out the depth gives the tempting 80.