Housing Economics and Real Estate: Need and Shortage, Affordable Housing, Slums, Valuation, Feasibility and Phasing
2. Affordable and incremental housing
Housing is affordable when a household can obtain adequate housing for no more than a stated share of its income (about 30% is the usual convention) and still meet its other basic needs. Cheaper construction alone does not achieve this; the cost has to be matched to income. The levers are cheaper land, lower and phased standards, cheaper finance and instalment payment, and building in stages. Incremental housing accepts that a poor household cannot afford a finished house on day one, so it designs the first stage to be habitable and safe and the layout to grow with the household’s means. John F. C. Turner’s argument (“housing as a verb”, freedom to build) is that what housing does for a family, and the control the family has over it, matters more than its finish.
| Approach | What the agency provides | What the household does | Best when |
|---|---|---|---|
| Sites-and-services | Plot with secure tenure, water, sanitation, roads, power | Builds its own house in stages | Land is available and cost per household must be low; risk is a distant site |
| Core housing | A minimal finished core: wet core and one room, often with roof | Extends the core as means allow | A minimum of safety and sanitation must be assured from the start |
| In-situ upgrading | Services, drainage, paving, facilities and tenure on the existing site | Improves its own dwelling | The housing is reasonably sound and livelihoods are local; avoids displacement; lowest cost per person |
| In-situ redevelopment with cross-subsidy | Rebuilt tenements for residents, paid for by selling part of the land or floor area on the market | Moves to the new unit on the same land | Land value is high enough to pay for the rehabilitation; density can rise |
| Rental housing | Public, employer or private rental stock, rent set within reach | Pays rent, no capital outlay | Households are mobile or cannot raise a down-payment, such as migrants |
| Inclusionary requirement | Rule that private projects reserve a share of units or land for EWS and LIG, often with extra FAR in return | Buys or rents the reserved unit | The market is active and land value can bear the cross-subsidy |
Incremental design means a plot sized to allow extension, load-bearing walls and a roof frame that allow rooms to be added or a floor built above, service lines sized for the final population, and a stage-one loan matched to income. Charles Correa’s Belapur housing in Navi Mumbai and Balkrishna Doshi’s Aranya at Indore are the usual Indian examples. Internationally, agencies funded sites-and-services and upgrading in the 1970s; by the late 1980s the enabling approach cast government as the provider of land, infrastructure, finance and regulation, with households and the market as the builders. A quick affordability check: a household earning ₹20,000 a month can afford about 30% × 20,000 = ₹6,000 a month for housing; an instalment above that fails the test however modest the house.
3. Slums, squatters and informal housing
Three terms are often run together; keep them apart. A slum is defined by the condition of the settlement: poor, overcrowded housing, inadequate services and insecurity. A squatter settlement is defined by tenure: land occupied without the owner’s permission. Informal housing is any housing outside formal planning, land-registration or building rules, which includes squatting and also unauthorised colonies built on land the buyers purchased. The three overlap but are not the same: decayed rental tenements in an old city core can be slums on land legally held; a squatter settlement can have sound houses; an unauthorised colony can be informal without being a slum.
Definitions used in Indian statistics. The Census of India recognises three kinds of slum: notified (notified as a slum by the state or local government or development authority under any Act), recognised (recognised as a slum by the authorities but not formally notified) and identified (a compact area of at least 300 population, or about 60 to 70 households, of poorly built, congested tenements in an unhygienic environment, usually with inadequate infrastructure and lacking proper sanitary and drinking-water facilities). The Slum Areas (Improvement and Clearance) Act, 1956 provided for declaring an area a slum for improvement or clearance, and states have enacted slum Acts of their own. The UN-Habitat definition works household by household: a slum household lacks one or more of durable housing, sufficient living area, access to improved water, access to improved sanitation, and security of tenure.
Causes. Urbanisation and migration outpace formal supply; land is dear and hoarded; regulation (large minimum plots, tight FAR, slow approvals) prices formal housing beyond the poor; incomes are low and irregular and credit is out of reach; rent control shrank rental supply and upkeep; public housing reached too few; the poor must live near informal work; and weak land records leave tenure insecure. Slums are a symptom of a housing market that does not serve low-income households, not merely of poverty.
| Approach | Idea | Result and limit |
|---|---|---|
| Eviction and clearance | Demolish and remove the settlement | Households re-form elsewhere; livelihoods are lost; costly and repeated |
| Public housing and relocation | Build finished tenements, often at the city edge | Cost per unit high, scale small; units sold or sublet; far from work |
| Sites-and-services | Serviced plots for self-build | Cheap and scalable; success depends on location and affordability |
| In-situ upgrading | Bring services and tenure to the existing site | Least disruptive and cheapest; needs sound housing and a defensible site |
| Security of tenure and regularisation | Recognise occupation, give legal rights | Encourages households to invest in their homes; legal and land-use limits remain |
| In-situ redevelopment with cross-subsidy | Rehouse residents on the same land, funded by market sale of part of it (Mumbai’s slum rehabilitation scheme) | No cost to the state, but only works where land value is high, and it densifies |
4. Real estate valuation
Market value is the most probable price in an open, competitive market between a willing buyer and a willing seller, each informed and acting without compulsion. Price is what was actually paid; cost is what it took to produce; value is an opinion of worth at a date. Land is valued at its highest and best use: the use that is legally permissible, physically possible, financially feasible and maximally productive. Four methods are standard, and the skill is choosing the right one for the property.
| Method | Principle and formula | Best used for |
|---|---|---|
| Comparison (market) | Value from recent sales of similar properties, adjusted for time, location, size and condition | Land, flats and houses in an active market |
| Cost (replacement) | Value = land value + (replacement cost new of the building − depreciation) | Special-purpose or new buildings with no sales or rents: schools, hospitals, public buildings |
| Income (capitalisation) | Value = net annual income ÷ capitalisation rate = net income × Years’ Purchase, where YP = 1 ÷ cap rate; net income = gross rent − outgoings | Rented and commercial property |
| Residual | Residual land value = gross development value − (construction, fees, finance, contingency and developer’s profit) | Land with development potential |
Income method. Outgoings are property tax, repairs, insurance, management and an allowance for vacancy, not loan interest. Example: gross rent ₹12,00,000 a year, outgoings 25%, so net income = ₹9,00,000; at a cap rate of 7.5%, value = 9,00,000 ÷ 0.075 = ₹1.2 crore (YP = 13.33). Value and cap rate move inversely: at 6% the same income is worth ₹1.5 crore. Residual method. Gross development value ₹40 crore; construction and fees ₹20 crore; finance and contingency ₹2 crore; developer’s profit 20% of GDV = ₹8 crore. Residual land value = 40 − 20 − 2 − 8 = ₹10 crore. Because the land value is what is left over, a small error in GDV or cost is magnified in the residual.
Depreciation is the loss of a building’s value with age and use; land does not depreciate. Its sources are physical deterioration (wear and decay), functional obsolescence (an outdated layout, no lift in a tall block) and economic or external obsolescence (a change in the surroundings, zoning or demand). Straight-line: annual depreciation = (cost − salvage) ÷ life, and depreciated value = cost − annual depreciation × age. Sinking fund: a yearly instalment, put aside at interest i, that grows to (cost − salvage) at the end of life: instalment = (C − S) × i ÷ ((1 + i)ⁿ − 1). Diminishing balance: a fixed percentage of the reducing value. Example. Building cost ₹50 lakh, salvage 10% (₹5 lakh), life 60 years, age 15 years: annual depreciation = 45 ÷ 60 = ₹0.75 lakh; accumulated = 15 × 0.75 = ₹11.25 lakh; depreciated value = 50 − 11.25 = ₹38.75 lakh.
5. Feasibility studies and market analysis
A feasibility study asks whether a proposed project should go ahead, and it moves through tests in order. Market: is there demand at a price or rent that works? Site and technical: can it be built here, given soil, access, services and the permitted land use, FAR and set-backs? Legal and regulatory: title, approvals and registration of the project under the real-estate regulation law. Financial: cost, revenue, funding and returns (NPV, IRR, break-even). Environmental and social: impacts and clearances. Risk: sensitivity to price, cost and delay. A cheap pre-feasibility screens many ideas; a detailed study is made for the few that survive; the outcome is go, no-go or redesign.
Market analysis reads both sides of the market. Demand side: population and household growth, income distribution, employment, preferred unit type and size, and affordability. Supply side: existing stock, vacancy, the pipeline of approved and under-construction projects, competing schemes, and price and rent trends. Data are primary (surveys, interviews, broker and site checks) or secondary (Census, registration records, listings). The output is a target segment, unit mix, price, a launch pace and a marketing plan.
| Indicator | Meaning | Reading |
|---|---|---|
| Absorption rate | Units sold or let per month or quarter | The pace the project can count on; phase sizes follow from it |
| Months of inventory | Unsold units ÷ monthly absorption | Falling means a tightening market; rising means oversupply |
| Vacancy rate | Vacant units ÷ total stock | High vacancy signals oversupply or a mismatch of type and price |
| Capture rate | The project’s expected share of the market’s absorption | A realistic share against competitors, not the whole demand |
Break-even. Units to be sold to cover fixed costs = fixed cost ÷ (price per unit − variable cost per unit). Example. Fixed costs ₹12 crore (land, approvals, trunk works), price ₹60 lakh, variable cost ₹40 lakh per unit, so the margin is ₹20 lakh and break-even = 1,200 lakh ÷ 20 lakh = 60 units. If the price falls 10% to ₹54 lakh the margin drops to ₹14 lakh and break-even rises to 1,200 ÷ 14 ≈ 86 units, a rise of about 43% from a 10% price cut. That magnification is why feasibility studies test sensitivity.
6. Locational decisions and economic analysis
In real estate, value is largely a product of location, meaning accessibility and neighbourhood. Bid-rent theory (Alonso, building on von Thünen) says every use bids for land by what accessibility is worth to it: commerce has the steepest bid-rent curve and takes the centre, then offices, then housing, so land value and residential density fall with distance from the centre. Burgess (concentric zones), Hoyt (sectors) and Harris and Ullman (multiple nuclei) describe the resulting patterns. Site-selection factors: accessibility by road and transit, infrastructure, neighbourhood quality and social facilities, land price and availability, zoning and FAR, market catchment and competition, hazards such as flooding, and the direction of city growth. A weighted-factor matrix gives each factor a weight and each site a score, then compares the weighted sums, after screening out sites that fail any must-have criterion; hedonic pricing estimates what each attribute adds to price.
| Measure | Definition | Decision rule |
|---|---|---|
| Net present value (NPV) | Sum of cash flows discounted at the required rate, less the initial outlay: NPV = Σ CFₜ ÷ (1 + r)ᵗ − I₀ | Accept if NPV > 0; among exclusive options choose the highest NPV |
| Internal rate of return (IRR) | The discount rate at which NPV = 0 | Accept if IRR exceeds the required (hurdle) rate |
| Payback period | Time for cumulative cash inflow to recover the outlay | Shorter is safer; ignores time value and cash after payback |
| Benefit–cost ratio (BCR) | PV of benefits ÷ PV of costs | Accept if BCR > 1; common for public projects |
Worked examples. NPV: invest 100; inflows 40, 50 and 60 at the end of years 1, 2 and 3; required return 10%. PV = 40 ÷ 1.1 + 50 ÷ 1.21 + 60 ÷ 1.331 = 36.36 + 41.32 + 45.08 = 122.76, so NPV = +22.76, accept. IRR: invest 200 and receive 288 after two years; (1 + r)² = 288 ÷ 200 = 1.44, so r = 20% a year (not 44%, which is the two-year total). Payback: invest 100; inflows 30, 40, 50, 60; cumulative 30, 70, 120, so payback = 2 + 30 ÷ 50 = 2.6 years. Financial versus economic analysis: a private appraisal uses market prices and the investor’s cash flows; an economic appraisal of a public project counts social costs and benefits, with shadow prices and externalities.
7. Project phasing and construction phasing
Project (development) phasing divides a large development into stages that are planned, approved, financed and sold in sequence. The reasons are to match supply to market absorption and avoid unsold stock, to limit the capital at risk and the peak funding, to bring in early revenue that pays for later phases, to build infrastructure in capacity steps, to learn from the market and adjust the unit mix, and to fit land assembly and approval timing. A usual order puts land, access and trunk infrastructure first, amenities (park, school, club) early because they support sales, and dense or commercial uses later when residents exist. Each phase should be complete, serviceable and saleable on its own. Phase size is roughly the absorption rate times the time the developer will carry unsold stock: at 20 units a month, a phase of 120 units sells out in 6 months.
Construction phasing sequences the actual building. Roads and utilities go in before the houses they serve. Blocks are completed in order so that early blocks can be occupied while later ones are built, which needs safe separation of occupied and construction areas (a separate site entrance, hoardings, crane radius kept clear of occupied buildings). Start dates overlap so that labour, formwork and cranes move from block to block, and repetition lowers cost. In redevelopment the first new building is built on vacant land and the existing residents are moved into it, their old buildings are cleared for the next phase, and so on (rolling redevelopment), which saves transit rent. Overlapping phases give the network rule: total duration = sum of the start offsets + the duration of the last phase. Example. Three phases of 12 months, each starting 6 months after the one before: duration = 2 × 6 + 12 = 24 months, not 36.
| Aspect | Project phasing | Construction phasing |
|---|---|---|
| Decides | What is launched, approved and sold when | In what order and overlap the work is built |
| Driven by | Market absorption, funding, approvals, land assembly | Site logistics, utilities, labour and equipment, occupancy safety |
| Main benefit | Lower risk and peak funding; early revenue | Early occupation, continuous use of crews, lower cost by repetition |
| Typical error | Phase larger than the market absorbs | Occupied homes next to an unsafe site, or services missing at handover |
Key takeaways
- Need is a standard, demand is need backed by ability to pay, supply is serviceable stock plus additions, and shortage is the unmet gap. Backlog = households − serviceable dwellings; need over a plan period = backlog + new households + replacements, plus a vacancy allowance if stated. Vacant premium flats and slums can coexist.
- Affordability means housing cost within a stated share of income (about 30% by convention). Sites-and-services gives serviced land, core housing adds a minimal finished core, in-situ upgrading improves a sound settlement where it stands, and cross-subsidised redevelopment rehouses residents on the same land. Incremental design lets the house grow with the household’s means.
- A slum is defined by condition, a squatter settlement by illegal tenure, informal housing by being outside formal rules; they overlap but are not equal. The Census has notified, recognised and identified slums (the last needs a compact area of at least 300 persons or about 60 to 70 households). Clearance alone only moves the problem; upgrading, tenure security and cross-subsidised redevelopment are the constructive approaches.
- Valuation: comparison for active markets, cost (land + depreciated replacement cost) for special-purpose buildings, income (value = net income ÷ cap rate) for rented property, residual (value = GDV − costs − profit) for development land. Straight-line depreciation = (cost − salvage) ÷ life per year; land is not depreciated; deduct outgoings before capitalising.
- A feasibility study passes market, site, legal, financial, environmental and risk tests in order; market analysis reads absorption, inventory, vacancy and capture. Break-even units = fixed cost ÷ (price − variable cost), and it is very sensitive to price. Locations are chosen by accessibility, bid-rent logic and a weighted-factor matrix.
- Appraise by NPV (accept if > 0), IRR (accept if above the required rate), payback (ignores time value and later cash) and BCR (accept if > 1); when measures conflict, trust NPV. Phase projects to the market’s absorption and funding, and phase construction by overlap: duration = sum of start offsets + last phase duration.
Practice questions (20)
Attempt each one before opening the answer. Every explanation names the tempting wrong option as well as the right one, because that is where marks are lost.
Effective housing demand is best defined as
Show answer
Answer: B — housing need that is backed by the willingness and ability to pay or to be financed
Effective demand is need that has purchasing power or financing behind it. The standard-based count of dwellings households should have is need, which is the tempting answer because it sounds like demand but ignores ability to pay; stock plus additions is supply, and the gap between households and serviceable dwellings is shortage.A city has thousands of unsold premium apartments and also large slum populations. Which explanation is most accurate?
Show answer
Answer: D — Need is not effective demand: unsold flats are priced beyond needy households, so the gap is in affordable units
The slum households have a real need, but no purchasing power, so they are not effective demand; the unsold stock is priced for another segment. The shortage is therefore one of affordable units, a mismatch of price, size and location. The surplus-of-dwellings reading is the tempting error because it counts dwellings and households without asking at what price.In what way does core housing differ from a sites-and-services scheme?
Show answer
Answer: A — The agency also builds a minimal core, such as a wet core and a room, which the household later extends
In both, the household finishes the house over time, but sites-and-services supplies only a serviced plot, while core housing adds a minimal built core (wet core and a room) first. Supplying a raw plot without services is the opposite of sites-and-services, and upgrading the existing settlement describes in-situ upgrading, which is the tempting confusion.A 30-year-old settlement on public land has reasonably sound houses, many residents who work in the adjacent market, and no piped water or sewerage. The city has no spare land nearby. Which first response fits best?
Show answer
Answer: C — Upgrade in situ by laying water, sewerage and drainage, paving lanes and giving security of tenure
Sound houses, local livelihoods and a missing service network point to in-situ upgrading: services and tenure on the existing site, with no displacement and the lowest cost per person. Clearance or peripheral resettlement breaks livelihoods, and with no spare land nearby, the full state-funded rebuild is both slow and unaffordable; peripheral plots only look generous.A property earns the same net income, but the market capitalisation rate for such property falls from 10% to 8%. By direct capitalisation its value will
Show answer
Answer: B — rise by 25%, since value is inversely proportional to the capitalisation rate
Value = net income ÷ cap rate, so with income I the value moves from I ÷ 0.10 = 10I to I ÷ 0.08 = 12.5I, a rise of 25%. The rise of 20% is the tempting slip of mirroring the 20% fall in the rate; value responds to the reciprocal of the rate, not to the rate itself.Which method is most appropriate for valuing a newly built school building that is not let and has no comparable sales?
Show answer
Answer: D — The cost method: land value plus depreciated replacement cost of the building
A special-purpose building with no market rent and no comparable sales is valued by the cost method: land value plus depreciated replacement cost. Capitalising a rent that is not paid is circular; flats are not comparable to a school; and the residual method values land for development, not a completed building.A tall residential block was built without a lift and is hard to let today. This loss of value is chiefly
Show answer
Answer: A — functional obsolescence, because the design no longer meets what occupiers expect
The block lacks a feature the market now expects, which is functional obsolescence, a defect of design rather than of wear. Physical deterioration is wear and decay of the fabric; economic obsolescence comes from outside the property, such as changed surroundings or demand; and land does not depreciate.A project costs ₹200 lakh and returns a single ₹288 lakh at the end of two years. Its IRR per year is
Show answer
Answer: C — 20%, from (1 + r)² = 288 ÷ 200 = 1.44
IRR is the rate at which the present value of the 288 equals the 200: 200 = 288 ÷ (1 + r)², so (1 + r)² = 1.44 and r = 20%. The 44% figure is the total two-year gain; halving it to 22% ignores compounding. Check: 200 × 1.2 × 1.2 = 288.Project P returns its outlay in 3 years and earns little afterwards; project Q returns it in 4 years and then earns large inflows for six more years. At the required rate Q has the higher NPV. Choosing between these mutually exclusive projects, which statement is best?
Show answer
Answer: B — Choose Q, because NPV counts the discounted inflows after payback, which payback ignores
NPV values all cash flows at the required rate, including the large inflows after year four, so the higher-NPV project Q should be chosen. Payback stops at the cut-off and ignores later cash and discounting; the argument for P confuses speed of recovery with value created. Mutually exclusive projects are ranked by NPV.Which is the strongest reason to phase the development of a large township?
Show answer
Answer: C — It matches supply to absorption, limits capital at risk, and lets early sales fund later phases
Phasing ties the pace of delivery to what the market absorbs, limits peak funding and capital exposed, and lets early revenue pay for later phases. Trunk infrastructure still has to be built in capacity steps from the start; later phases are not guaranteed higher prices; and approvals cannot be deferred until after construction.In bid-rent theory, commercial uses occupy the most central land mainly because
Show answer
Answer: D — accessibility is worth more to commerce than to other uses, so it bids more and takes the centre
Bid-rent theory explains land use by willingness to pay: commerce gains most from central accessibility, so its bid-rent curve is steepest and it wins the centre, with offices and then housing further out. Zoning and construction cost are not the cause, and households do value accessibility; they simply cannot outbid commerce for it.Select the correct statements about slums and squatters.
Show answer
Answer: A — A squatter settlement is defined by occupation of land without the owner’s permission, whatever the quality of its houses; C — A slum can exist on legally held land, as with decayed rental tenements in an old city core; D — A Census identified slum is a compact area of at least 300 persons or about 60 to 70 households of poorly built, congested tenements without proper services
A squatter settlement is a matter of tenure, a slum a matter of condition, and the two overlap without being identical: slums may stand on legally held land, and the Census identified slum is a compact area of about 300 persons or 60 to 70 households with poor housing and services. The claim that every slum is on encroached land merges the two categories.Select the correct statements about valuation.
Show answer
Answer: B — In the income method, net income is gross rent less outgoings, and value is net income divided by the capitalisation rate; C — In the residual method, land value is gross development value less construction, fees, finance, contingency and developer’s profit; D — Under straight-line depreciation a building of cost C and salvage S loses (C − S) divided by its life each year
The income, residual and straight-line statements are the standard formulas. Land does not depreciate; its value follows the market and its highest and best use, so depreciating it like a building is the error.Which of the following belong in the market analysis for a proposed housing project?
Show answer
Answer: A — The income distribution of the likely buyers; B — The absorption rate of comparable projects; D — The pipeline of approved and under-construction competing projects
Market analysis reads demand (buyers’ incomes, household growth) and supply (stock, pipeline, vacancy, absorption). The facade colour is a design decision and tells nothing about demand or supply in the market.Which of the following expand the supply of affordable housing?
Show answer
Answer: B — Requiring private projects to reserve a share of units for EWS and LIG, often with extra FAR in return; D — Redeveloping a slum in situ, with sale of part of the land funding free rehabilitation tenements
A reservation or inclusionary rule with a FAR incentive, and cross-subsidised in-situ redevelopment, both create affordable units. Raising plot-size and floor-area standards, or slowing approvals, raises cost and delay and pushes housing out of the reach of low-income households, adding to informal supply instead.At the start of a ten-year plan a town has 40,000 households and 36,000 serviceable dwellings (one household per dwelling). Over the plan period 12,000 additional households will form, and 5% of the existing 36,000 serviceable dwellings will become unfit and must be replaced. Ignoring any vacancy allowance, the number of dwellings to be built over the plan period is ____.
Numerical answer — type the value.
Show answer
Answer: 17800
Backlog = 40,000 − 36,000 = 4,000. New households = 12,000. Replacement = 5% of 36,000 = 1,800. Need = 4,000 + 12,000 + 1,800 = 17,800 dwellings. Omitting the replacement gives 16,000, and counting only growth gives 12,000.A shop block earns a gross rent of ₹9,60,000 a year; outgoings (property tax, repairs, management) are 25% of the gross rent. At a capitalisation rate of 9%, its value, in ₹ lakh, is ____.
Numerical answer — type the value.
Show answer
Answer: 80
Outgoings = 0.25 × 9,60,000 = 2,40,000, so net income = 7,20,000. Value = 7,20,000 ÷ 0.09 = 80,00,000 = ₹80 lakh. Capitalising the gross rent would give 106.67 lakh, which is the usual slip. Check: 80 lakh × 9% = 7.2 lakh.A site can be developed with a gross development value of ₹60 crore, construction and fees of ₹24 crore, and finance and contingency of ₹3 crore. The developer requires a profit of 20% of GDV, and must also pay 5% of the land price in stamp duty and legal costs. The highest land price the developer can bid, in ₹ crore, is ____.
Numerical answer — type the value.
Show answer
Answer: 20
Profit = 0.20 × 60 = 12. Money left for land and its purchase costs = 60 − 24 − 3 − 12 = 21. If the land price is L, then L + 0.05L = 21, so L = 21 ÷ 1.05 = 20. Treating 21 as the land price ignores the purchase costs; check: 20 + 1 = 21.A project requires an outlay of ₹150 lakh today and returns ₹60 lakh, ₹70 lakh and ₹80 lakh at the end of years 1, 2 and 3. At a required return of 8% a year, its NPV, in ₹ lakh to the nearest whole number, is ____.
Numerical answer — type the value.
Show answer
Answer: 29
PV = 60 ÷ 1.08 + 70 ÷ 1.1664 + 80 ÷ 1.259712 = 55.56 + 60.01 + 63.51 = 179.08. NPV = 179.08 − 150 = 29.08, which is 29 to the nearest whole number. Summing the undiscounted inflows (210) and subtracting 150 would give 60, the trap of ignoring the time value of money.A township is built in four phases, each taking 18 months to build. Each phase starts 9 months after the previous phase starts. The number of months from the start of the first phase to the completion of the last is ____.
Numerical answer — type the value.
Show answer
Answer: 45
The last phase starts 3 × 9 = 27 months after the first and takes 18 months, so completion is at 27 + 18 = 45 months. Adding the full durations (4 × 18 = 72) would ignore the overlap.