Sizing of Solar PV Systems: Load, Load Factor, Days of Autonomy, Battery, Inverter and Array Size
2. Peak sun hours and PV array size
The daily insolation on the tilted array, in kWh/m²/day, equals the number of peak sun hours (PSH): the hours of a hypothetical 1 kW/m² sun that would deliver the same energy. An insolation of 5 kWh/m²/day is 5 PSH; it is not 5 hours of daylight. A module rated Prated (peak watts, at 1 kW/m²) therefore delivers about Prated × PSH per day before losses.
Real output falls short of this because of cell heating, soiling, wiring and mismatch, and the efficiency of the controller or inverter and of battery charging. Combine them into one system derating factor η_sys (given in a problem; typical values are below 1, around 0.6 to 0.8). Then Parray (Wp) = E_dc/(PSH × η_sys), where E_dc is the daily energy the array must supply (the load divided by the inverter efficiency for AC loads). The same formula run backwards gives daily yield = Parray × PSH × η_sys, and the ratio of actual yield to Parray × PSH is the performance ratio.
3. Battery sizing: autonomy, depth of discharge, efficiency
Days of autonomy N is the number of consecutive days the battery alone must carry the load with no useful sun. Depth of discharge (DoD) is the fraction of nominal capacity that may be used; a battery is not drained fully, to protect its life, so the nominal capacity must exceed the energy drawn. With battery efficiency ηb on the energy that passes through it,
Battery energy (Wh) = E_dc × N/(DoD × ηb) and capacity (Ah) = Wh/Vbus. Halving the permitted DoD doubles the bank; doubling N doubles it; the array is unaffected by N because it is sized for one day's energy. Cells are wired in series to reach the bus voltage and in parallel to reach the ampere-hours: twelve-volt, 100 Ah batteries for a 48 V, 400 Ah bank need 48/12 = 4 in series and 400/100 = 4 such strings, 16 in all.
4. Inverter, charge controller and module arrangement
The inverter converts DC to AC and is rated by the power it must deliver, not by the daily energy. Rule: inverter rating ≥ (the largest AC load that can run simultaneously) × a safety factor, commonly 1.25 (stated in a problem). Loads that surge on starting, such as motors and compressors, can draw several times their running power; either the inverter must tolerate that surge or the load must be started alone. Inverter efficiency enters the energy chain: E_dc = E_ac/ηinv.
The charge controller protects the battery from overcharge and deep discharge. It is rated for the array current: Icontroller ≥ Np × Isc,module × 1.25, since Isc, not Imp, is the largest the array can pass and 1.25 allows for irradiance above 1 kW/m² (the factor is stated in a problem). For the module count, N = Parray/Pmodule, rounded up; the series count per string is set by the bus or the inverter's input window, Ns = Vbus/Vmp,module for a direct-coupled array, and Np = N/Ns. For an MPPT controller a longer string is allowed, subject to the cold-weather Voc limit of the previous chapter.
| Component | Governed by | Formula |
|---|---|---|
| Array | daily energy, PSH, losses | E_dc/(PSH × η_sys) |
| Battery | daily energy, autonomy, DoD | E_dc × N/(DoD × ηb) |
| Inverter | simultaneous peak (and surge) | Psim × 1.25 |
| Charge controller | array short-circuit current | Np × Isc × 1.25 |
5. Tilt, module count and string layout
A fixed array faces the equator (south in the northern hemisphere). A tilt close to the latitude maximises the yearly energy; a steeper tilt favours winter and a shallower one summer, so a stand-alone system sized on its worst month leans to the steeper side. Shading must be avoided: even a small shadow on one module can cut a whole series string, as the previous chapter explained.
Worked example (layout). A 2.0 kWp array uses 250 Wp modules with Vmp = 30 V, Imp = 8.33 A. The module count is 2000/250 = 8. The MPPT controller accepts strings of four modules (4 × 30 = 120 V at the maximum power point), so Ns = 4 and Np = 8/4 = 2. The array current at the maximum power point is 2 × 8.33 = 16.7 A at 120 V, which is 2000 W. If the controller had to be directly coupled to a 24 V battery bank, modules of a lower Vmp would be needed, with Ns chosen so that Ns × Vmp matches the charging voltage.
6. A full worked design
A cabin has four 10 W lamps for 6 h, two 60 W fans for 8 h and a 100 W TV for 4 h, all AC. E_ac = 4 × 10 × 6 + 2 × 60 × 8 + 100 × 4 = 240 + 960 + 400 = 1600 Wh/day. If all run together the peak is 40 + 120 + 100 = 260 W. The data given: inverter efficiency 0.90, bus 24 V, PSH 5, η_sys 0.75, autonomy 2 days, DoD 0.5, battery efficiency 0.85, inverter safety factor 1.25.
- DC energy: E_dc = 1600/0.90 = 1777.8 Wh/day.
- Array: 1777.8/(5 × 0.75) = 474 Wp; 474/250 = 1.9, so with 250 Wp modules 2 modules (500 Wp) are needed.
- Battery: 1777.8 × 2/(0.5 × 0.85) = 8366 Wh, so 8366/24 = 349 Ah at 24 V.
- Inverter: 260 × 1.25 = 325 W at least.
Key takeaways
- E = Σ P·h gives daily energy; load factor LF = E/(Ppeak × 24 h). Energy sizes array and battery, the simultaneous peak sizes the inverter.
- Peak sun hours equal insolation in kWh/m²/day. Array Wp = E_dc/(PSH × η_sys); use the tilted plane and, for a year-round stand-alone system, the worst month.
- Battery Wh = E_dc × N/(DoD × ηb); Ah = Wh/Vbus. DoD and efficiency divide; the array does not depend on days of autonomy.
- Inverter ≥ simultaneous AC load × safety factor (check motor surge); AC loads need E_dc = E_ac/ηinv. Charge controller current ≥ Np × Isc × 1.25.
- Series sets bus voltage, parallel sets ampere-hours or current: a 48 V, 400 Ah bank from 12 V, 100 Ah units uses 4 × 4 = 16.
Practice questions (17)
Attempt each one before opening the answer. Every explanation names the tempting wrong option as well as the right one, because that is where marks are lost.
A load has an average power of 0.4 kW over a day and a peak demand of 2.0 kW. Its daily load factor is
Show answer
Answer: B — 0.20, the ratio of average to peak power
Load factor = average/peak = 0.4/2.0 = 0.20; it cannot exceed 1, which rules out the inverted ratio 5.0.At a site the daily insolation on the tilted array is 5.5 kWh/m²/day. In sizing a PV array this is used as
Show answer
Answer: D — 5.5 peak sun hours, the hours of 1 kW/m² that would give the same energy
Because STC irradiance is 1 kW/m², an insolation of 5.5 kWh/m²/day is numerically 5.5 PSH. It is neither the length of the day nor the hours of rated output, since the real irradiance varies and output carries losses.In a stand-alone system the permitted depth of discharge of the battery is lowered from 0.8 to 0.4 with every other quantity unchanged. The required nominal battery capacity
Show answer
Answer: A — doubles
Capacity ∝ 1/DoD, so 0.8/0.4 = 2: the bank doubles because only 40 % of each ampere-hour may be used. Halving would follow if DoD were mistakenly placed in the numerator.A designer raises the days of autonomy from 2 to 3 with load, PSH and all efficiencies unchanged. Which is correct?
Show answer
Answer: C — The battery grows by 50 % and the array is unchanged, since the array covers a single day
Battery energy ∝ N, giving 3/2 = 1.5. The array is sized for one day's energy divided by PSH, with no N in it, and the inverter depends on the simultaneous peak, which has not changed.A stand-alone system is sized with the annual average of 5.0 PSH. In the worst month the tilted-plane insolation is 3.5 kWh/m²/day. If the load is the same every month, the array needed for that month is larger than the average-based array by a factor of nearest
Show answer
Answer: D — 1.43
Array ∝ 1/PSH, so the ratio is 5.0/3.5 = 1.43. The factor 0.70 is the inverse, which would be a smaller array.Which statement about sizing the inverter of a stand-alone system is correct?
Show answer
Answer: A — It is sized on the simultaneous AC load with a safety margin, and must handle motor starting surges
An inverter is a power device: its watt rating must cover the largest simultaneous load (plus surge, plus margin). Daily energy and autonomy belong to the array and battery, and the array rating is set by the energy chain, not by the inverter.A 48 V, 400 Ah bank is built from 12 V, 100 Ah batteries. The number of batteries needed is
Show answer
Answer: C — 16
Series: 48/12 = 4 per string; parallel: 400/100 = 4 strings; total 4 × 4 = 16. Counting only the series set gives 4, and only the energy ratio would not need two separate checks.An array has 4 parallel strings of identical modules, each with Isc = 9 A and Imp = 8.3 A. The charge controller is rated 1.25 times the array short-circuit current. The minimum current rating, in amperes, is
Show answer
Answer: B — 45.0
Isc,array = 4 × 9 = 36 A; × 1.25 = 45 A. The value 41.5 uses Imp (4 × 8.3 × 1.25), but the controller must stand the short-circuit current, and 36 A omits the margin.Two designs deliver the same daily energy to an AC load. Design X has a flat load (load factor 0.9); design Y has a peaky load (load factor 0.2). With the same efficiencies and PSH, which is correct?
Show answer
Answer: A — Y needs a larger inverter rating than X, while the array and battery energy are unchanged
With equal E, the peak = E/(24 × LF), so Y's peak is 0.9/0.2 = 4.5 times X's and so is its inverter. The array and the battery depend on E alone, which is equal.For a stand-alone system with the other factors fixed, which of the following are correct?
Show answer
Answer: A — Battery capacity is directly proportional to the days of autonomy; B — Battery capacity is inversely proportional to the permitted depth of discharge; C — Array peak watts are inversely proportional to the peak sun hours
Battery Wh = E_dc N/(DoD ηb) gives the first two, and Parray = E_dc/(PSH η_sys) gives the third. N does not enter the array formula, so the statement tying array watts to days of autonomy is wrong.Which of the following statements about load factor are correct?
Show answer
Answer: A — Over a day it equals the daily energy divided by the peak power times 24 hours; B — A perfectly constant load has a load factor of 1; D — For the same daily energy, a lower load factor means a higher peak demand
LF = E/(Ppeak × 24) = average/peak, so a flat load gives 1 and, for fixed E, a lower LF means a larger peak. The ratio of peak to average is the reciprocal and exceeds 1.Which of the following statements about the parts of PV systems are correct?
Show answer
Answer: A — A charge controller protects the battery from overcharge and from deep discharge; C — A stand-alone system that must work all year is sized on the month of poorest insolation or heaviest load; D — Days of autonomy is the number of days the battery alone can supply the load
The statements on the charge controller, on sizing for the poorest month and on days of autonomy are standard definitions and design practice. A grid-tied inverter uses the grid as the store, so no battery is required.A household uses 7.2 kWh of energy in a day and its peak demand is 1.5 kW. Taking 24 h in a day, its daily load factor, to two decimal places, is ____.
Numerical answer — type the value.
Show answer
Answer: 0.20
Average power = 7.2/24 = 0.30 kW; LF = 0.30/1.5 = 0.20.A load needs 1600 Wh/day of AC energy. The inverter efficiency is 0.90, the site has 5 peak sun hours and the combined array-side derating factor is 0.75. The array peak rating in watts needed, rounded to the nearest whole number, is ____.
Numerical answer — type the value.
Show answer
Answer: 474
E_dc = 1600/0.90 = 1777.8 Wh/day; Parray = 1777.8/(5 × 0.75) = 1777.8/3.75 = 474.07, i.e. 474 W. Verified in Python.The daily DC energy requirement is 1777.8 Wh. Design for 2 days of autonomy, depth of discharge 0.5 and battery efficiency 0.85, on a 24 V bus. The nominal battery capacity in ampere-hours, rounded to the nearest whole number, is ____.
Numerical answer — type the value.
Show answer
Answer: 349
Wh = 1777.8 × 2/(0.5 × 0.85) = 3555.6/0.425 = 8366.0 Wh; Ah = 8366.0/24 = 348.6, i.e. 349 Ah. Verified in Python.The connected AC loads total 1600 W, but at most 75 % of that runs at any one time. The inverter is to be rated at 1.25 times the largest simultaneous load. The minimum inverter rating in watts is ____.
Numerical answer — type the value.
Show answer
Answer: 1500
Simultaneous load = 0.75 × 1600 = 1200 W; × 1.25 = 1500 W. Using the full 1600 W would give 2000 W.A 3 kWp array at a site with 5.5 peak sun hours has an overall system derating factor of 0.78. The energy delivered per day, in kWh and to two decimal places, is ____.
Numerical answer — type the value.
Show answer
Answer: 12.87
Yield = rated kW × PSH × derating = 3 × 5.5 × 0.78 = 12.87 kWh/day. Ignoring the derating gives 16.5 kWh, the trap value.