Metrology and Statistical Quality Control in Numbers: Limits and Fits, Gauge Design, Sine Bars, Thread Wires, Surface Roughness, Control Charts, Process Capability, Sampling Plans and Six Sigma
Linear, Angular, Thread and Surface Measurement
Slip gauges build a size from the fewest blocks, eliminating decimal places from the right: 47.375 = 1.005 + 1.37 + 5 + 40 = 47.375 mm (four blocks). A sine bar of length L set to angle θ needs a stack h = L sin θ: for 200 mm and 25° it is 84.524 mm. The error sensitivity is dθ = dh/(L cos θ), so a 0.002 mm stack error costs 2.3″ at 25° but 4.1″ at 60°; hence the rule that a sine bar is not used above about 45°, where cos θ is small. Thread inspection by three wires (the best-size wire w = 0.57735 p for a 60° thread) gives the effective diameter E = M − 3w + 0.866p; for a 2 mm pitch w = 1.1547 mm, and if the micrometer reads M = 20.433 mm over the wires the effective diameter is 18.701 mm. Surface roughness: the arithmetic mean of absolute deviations R_a = (Σ|y|)/n; for the profile 2, −3, 4, −1, −2, 3, −4, 1 µm it is 2.50 µm, and the rms R_q = 2.74 µm is larger because squaring weights peaks. A turned surface with feed f and nose radius r has a theoretical R_max = f²/(8r) = 6.25 µm and R_a ≈ f²/(18√3 r) = 1.60 µm (f = 0.2 mm/rev, r = 0.8 mm), so halving the feed cuts roughness four-fold; the stylus (contact) and optical (non-contact) methods measure these same quantities. Form errors (straightness, flatness, roundness, run-out, cylindricity) are found by autocollimator, optical flat, V-block with dial gauge and the roundness machine.
| Instrument | Relation | Result |
|---|---|---|
| Sine bar 200 mm, 25° | h = L sin θ | 84.524 mm |
| Three-wire best size | w = 0.57735 p | 1.1547 mm |
| Turned R_max | f²/(8r) | 6.25 µm |
| Turned R_a | f²/(18√3 r) | 1.60 µm |
Slip gauges build a size from the fewest blocks, eliminating decimal places from the right: 47.375 = 1.005 + 1.37 + 5 + 40 = 47.375 mm (four blocks). A sine bar of length L set to angle θ…
Control Charts and Process Capability
A control chart puts limits at the centre line ± 3σ of the plotted statistic, so a stable process stays inside 99.73% of the time. X-bar and R charts (variables) with subgroup size n = 5 and constants A₂ = 0.577, D₃ = 0, D₄ = 2.114, d₂ = 2.326: from X̿ = 50.0 and R̄ = 2.5, the X-bar limits are X̿ ± A₂R̄ = 48.56 to 51.44 and the R-chart upper limit is D₄R̄ = 5.29. The estimated process sigma is σ̂ = R̄/d₂ = 1.075. For attributes: a p chart with p̄ = 0.04 and n = 100 has limits 0.04 ± 3√(0.04 × 0.96/100) = 0.000 to 0.0988 (a negative lower limit is set to zero); a c chart (defects per unit) with c̄ = 9 has c̄ ± 3√c̄ = 0 to 18. Capability: C_p = (USL − LSL)/6σ is the potential and C_pk = min(USL − μ, μ − LSL)/3σ the actual. With specification 46–54: C_p = 1.24 for a centred process, C_pk = 0.93 with the mean drifted to 51; the fraction nonconforming is 0.020% centred and 0.263% at the drifted mean — a C_p above 1 can still hide a non-conforming process, which is why C_pk is quoted with it. Control limits describe what the process does; specification limits describe what the customer wants; they must never be compared on one chart.
| Chart | Limits | This example |
|---|---|---|
| X-bar | X̿ ± A₂R̄ | 48.56 – 51.44 |
| R (upper) | D₄R̄ | 5.29 |
| p | p̄ ± 3√(p̄(1 − p̄)/n) | 0 – 0.0988 |
| c | c̄ ± 3√c̄ | 0 – 18 |
A control chart puts limits at the centre line ± 3σ of the plotted statistic, so a stable process stays inside 99.73% of the time. X-bar and R charts (variables) with subgroup size n = 5…
Acceptance Sampling, Six Sigma and the Cost of Poor Quality
A single sampling plan (n, c) draws n items and accepts the lot if at most c are defective; the operating characteristic (OC) curve gives the acceptance probability P_a(p). For n = 50, c = 2 (binomial): P_a(2%) = 0.922 and P_a(4%) = 0.677, so the plan separates good lots from bad ones but not sharply. The average outgoing quality after rectifying inspection is AOQ ≈ p P_a = 0.02 × 0.922 = 1.84%, and it peaks at an intermediate p (the AOQL). The producer's risk α is the chance of rejecting an AQL lot, the consumer's risk β the chance of accepting an LTPD lot. Six sigma means a process whose mean is 6σ from either limit; allowing a long-term 1.5σ drift leaves a 4.5σ tail, a defect rate of 3.4 per million (DPMO), against 2,700 DPMO for a two-sided ±3σ process. Taguchi's loss function L = k(y − m)² says loss grows with the square of deviation from target even inside the tolerance: if ₹100 is lost at the tolerance limit ±0.5 mm, k = 100/0.5² = 400, so a deviation of 0.2 mm costs ₹16. The cost of quality splits into prevention, appraisal, internal failure and external failure; spending on prevention is the cheapest, and ISO 9001:2015 builds a risk-based management system around this idea.
| Measure | Definition | Value here |
|---|---|---|
| P_a at 2% defective | Binomial, n = 50, c = 2 | 0.922 |
| AOQ at 2% | p P_a | 1.84% |
| DPMO at 4.5σ tail | Six sigma with 1.5σ shift | 3.4 |
| Taguchi loss, 0.2 mm | k(y − m)² | ₹16 |
A single sampling plan (n, c) draws n items and accepts the lot if at most c are defective; the operating characteristic (OC) curve gives the acceptance probability P_a(p). For n = 50, c =…
Key takeaways
- IT7 = 16i and IT6 = 10i with i = 0.45∛D + 0.001D; clearance limits of a fit follow from the two deviations and two tolerances.
- GO gauge: maximum material, full form; NO-GO gauge: minimum material, single point (Taylor).
- Sine bar stack h = L sin θ; its angle error grows as 1/cos θ; three-wire best size is 0.57735 p.
- X-bar limits are X̿ ± A₂R̄, σ̂ = R̄/d₂, and C_pk = min(USL − μ, μ − LSL)/3σ is never above C_p.
- P_a(p) from the binomial gives the OC curve; Taguchi loss is quadratic in deviation from target.
Practice questions (24)
Attempt each one before opening the answer. Every explanation names the tempting wrong option as well as the right one, because that is where marks are lost.
In Taylor's principle of gauging, the GO gauge checks:
Show answer
Answer: B — The maximum material limit and the full form of the feature
The GO gauge must enter over the full length to prove the part assembles, so it carries the maximum-material limit and full form; the NO-GO tests the minimum-material limit by single-point contact so that one bad cross-section is caught.For a 40 H7/g6 fit with hole tolerance 25 µm, shaft tolerance 16 µm and shaft upper deviation −9 µm, the maximum clearance in µm is:
Numerical answer — type the value.
Show answer
Answer: 50
Largest hole 25 µm, smallest shaft −9 − 16 = −25 µm; maximum clearance = 25 − (−25) = 50 µm. The minimum clearance (0 − (−9) = 9 µm) is the other limit.A 200 mm sine bar is set to 25°. The slip-gauge stack height in mm (three decimals) is:
Numerical answer — type the value.
Show answer
Answer: 84.524
h = L sin θ = 200 × sin 25° = 200 × 0.42262 = 84.524 mm. Using cos would give 181.26 mm, the height for 65°.
Show the other 21 questions
Why is a sine bar avoided above about 45°?
Show answer
Answer: D — The angle error per unit stack error, 1/(L cos θ), grows rapidly as θ approaches 90°
dθ = dh/(L cos θ): the same 0.002 mm stack error costs 4.1″ at 60° against 2.3″ at 25°, and the factor diverges toward 90°, so the bar is used at small angles or with a datum correction.A turned surface is produced with feed 0.2 mm/rev and tool nose radius 0.8 mm. The theoretical peak-to-valley roughness R_max = f²/(8r) in µm (two decimals) is:
Numerical answer — type the value.
Show answer
Answer: 6.25
R_max = 0.2²/(8 × 0.8) = 0.04/6.4 = 0.00625 mm = 6.25 µm. The arithmetic average R_a is much smaller, 1.60 µm.An X-bar chart with subgroup size 5 (A₂ = 0.577) has grand mean 50.0 and mean range 2.5. The upper control limit is:
Numerical answer — type the value.
Show answer
Answer: 51.44
UCL = X̿ + A₂R̄ = 50.0 + 0.577 × 2.5 = 51.44. Using the R-chart constant D₄ = 2.114 here would give 55.3 — a wrong chart.A process has σ = 1.075 and specification limits 46 to 54, but its mean has drifted to 51. C_pk (two decimals) is:
Numerical answer — type the value.
Show answer
Answer: 0.93
C_pk = min(54 − 51, 51 − 46)/(3 × 1.075) = 3/3.225 = 0.93, set by the nearer limit. C_p = 8/(6 × 1.075) = 1.24 ignores the drift.For a c chart with mean defects per unit c̄ = 9, the 3-sigma limits are:
Show answer
Answer: C — 0 and 18, from 9 ± 3√9
The Poisson standard deviation is √c̄ = 3, so the limits are 9 ± 9 = 0 and 18. The p-chart formula, which uses the binomial variance, does not apply to a count of defects per unit.A single sampling plan with n = 50 and c = 2 is applied to a lot that is 2% defective (binomial). The probability of acceptance (three decimals) is:
Numerical answer — type the value.
Show answer
Answer: 0.922
P_a = Σk=0² C(50,k)(0.02)^k(0.98)^(50−k) = 0.922. The Poisson approximation (λ = 1) gives 0.920, close but not exact.Which statements are correct?
Show answer
Answer: A — C_pk can never exceed C_p; B — Selective assembly achieves a tight fit from wide part tolerances by grading parts into groups; C — Control limits are set by process variation, specification limits by the customer
C_pk equals C_p only when centred. Taguchi loss is quadratic about the target, not a step at the limits, so the third statement is false.An X̄ (mean) control chart is used to monitor
Show answer
Answer: D — the central tendency (process average) of a measured characteristic
The X̄ chart tracks the process mean; spread is tracked by the paired R or s chart. Fraction defective and defects-per-unit are attribute charts (p and c), the tempting confusions.A p-chart in statistical process control plots
Show answer
Answer: B — the fraction (proportion) of defective items in a sample
A p-chart monitors the proportion defective (attribute by classification). The number of defects per unit is a c-chart, and mean/range are variables charts, the tempting mix-ups.A clearance fit between a shaft and a hole guarantees that
Show answer
Answer: C — the hole is always larger than the shaft, leaving a positive gap
In a clearance fit the smallest hole still exceeds the largest shaft, so a gap always exists. A shaft larger than the hole is an interference fit, the tempting opposite.A sine bar is used to measure
Show answer
Answer: A — angles accurately using gauge blocks and a known length
A sine bar converts an angle to a height (h = L·sin θ) set by gauge blocks. Roughness and hardness use different instruments entirely, the tempting distractors.In acceptance sampling, the producer’s risk (α) is the probability of
Show answer
Answer: C — rejecting a good lot
Producer’s risk α is rejecting a lot that is actually acceptable; accepting a bad lot is the consumer’s risk β. Swapping the two is the standard confusion.A hole has a size of 50.00 mm with limits 49.95 and 50.05 mm. Its tolerance, in mm (two decimals), is ____.
Numerical answer — type the value.
Show answer
Answer: 0.1
Tolerance = upper limit − lower limit = 50.05 − 49.95 = 0.10 mm. The ±0.05 deviation is the one-sided value, not the total tolerance, the tempting half-answer.An X̄ chart has process mean 50, standard deviation 2 and subgroup size 4. Its upper control limit, X̄ + 3σ/√n, is ____.
Numerical answer — type the value.
Show answer
Answer: 53
UCL = 50 + 3 × 2/√4 = 50 + 3 = 53. Using σ (not σ/√n), i.e. 50 + 6 = 56, ignores that the mean of a subgroup has a smaller standard error.A hole is 20.00/20.03 mm and a shaft 19.96/20.00 mm. The maximum clearance of this fit, in mm (two decimals), is ____.
Numerical answer — type the value.
Show answer
Answer: 0.07
Max clearance = largest hole − smallest shaft = 20.03 − 19.96 = 0.07 mm. Using largest hole − largest shaft (0.03) gives the minimum clearance instead.A 200 mm sine bar is set to measure an angle of 30°. The gauge-block stack height required, h = L·sin θ, in mm, is ____.
Numerical answer — type the value.
Show answer
Answer: 100
h = 200 × sin 30° = 200 × 0.5 = 100 mm. Using tan 30° (115.5) applies the wrong trig function for the sine-bar height.Which statements about an operating characteristic (OC) curve of a single sampling plan are correct?
Show answer
Answer: A — Acceptance probability falls as fraction defective rises; B — A larger sample size makes the curve steeper; C — It plots probability of acceptance against lot fraction defective
The OC curve relates P(accept) to the defective fraction, steepens with sample size, and decreases as quality worsens. Accepting every lot regardless of quality is the opposite of discrimination, the trap.Two independent measurement errors of ±0.003 mm and ±0.004 mm combine in a chain. The resultant (root-sum-square) uncertainty, in mm (three decimals), is ____.
Numerical answer — type the value.
Show answer
Answer: 0.005
RSS = √(0.003² + 0.004²) = √(0.000025) = 0.005 mm. Adding them directly (0.007) overstates the combined random uncertainty, which combines in quadrature.A process has specification limits 49.7 and 50.3 mm and a standard deviation of 0.1 mm. Its process capability C_p = (USL − LSL)/(6σ) is ____.
Numerical answer — type the value.
Show answer
Answer: 1.0
C_p = (50.3 − 49.7)/(6 × 0.1) = 0.6/0.6 = 1.0, a just-capable process. Using 3σ instead of 6σ in the denominator doubles C_p to 2.0, misstating capability.For the same process (σ = 0.1, specs 49.7–50.3) but with the mean shifted to 50.1 mm, the C_pk = min(USL − μ, μ − LSL)/(3σ) is ____ (three decimals).
Numerical answer — type the value.
Show answer
Answer: 0.667
C_pk = min(50.3 − 50.1, 50.1 − 49.7)/(3 × 0.1) = min(0.2, 0.4)/0.3 = 0.2/0.3 = 0.667, below C_p = 1 because the mean is off-centre. Using the larger difference (0.4/0.3 = 1.33) ignores that C_pk takes the worse side.A single sampling plan takes n = 5 and accepts on c ≤ 1 defective. For an incoming fraction defective of 0.10, the probability of acceptance (binomial, three decimals) is ____.
Numerical answer — type the value.
Show answer
Answer: 0.919
P_a = P(0) + P(1) = 0.9⁵ + 5(0.1)(0.9⁴) = 0.590 + 0.328 = 0.919. Counting only P(0) = 0.590 forgets that one defective is still accepted (c = 1).