Environmental and Natural Resource Economics: Accounts, Externalities, Cost-Benefit and Natural Capital
2. Externalities, Footprints and Credits
An externality is a cost or benefit of an activity that falls on people who did not choose it and is not reflected in the price. A negative externality is a cost imposed on others: a factory's smoke harms residents' health, and since the firm does not pay, it produces more than is socially best. A positive externality is an unpaid benefit: a beekeeper's bees pollinate a neighbour's orchard, or a farmer's tree cover recharges groundwater, so too little of it is supplied. Remedies include taxes and charges, regulation, tradable permits and, for positive ones, subsidies. Ecological capital (natural capital) is the stock of natural assets that yields a flow of services. The carbon footprint is the total greenhouse gas emitted by an activity, person or product, in CO₂ equivalent; a carbon credit is a tradable permit that represents one tonne of CO₂ (or its equivalent) avoided or removed, which lets those who can cut emissions cheaply sell the credit to those for whom cutting is costly.
| Type | Example | Market outcome | Remedy |
|---|---|---|---|
| Negative | Factory smoke, river pollution | Over-production | Tax, standards, tradable permits |
| Positive | Bees pollinating an orchard; tree cover | Under-supply | Subsidy, payment for services |
An externality is a cost or benefit of an activity that falls on people who did not choose it and is not reflected in the price. A negative externality is a cost imposed on others: a…
3. Cost-Benefit Analysis and Extended Producer Responsibility
Cost-benefit analysis (CBA) values all the costs and benefits of a project, discounts future amounts to the present, and compares them. The process: define the project and alternatives; list impacts; put money values on them; choose a discount rate; compute the net present value (NPV) = Σ benefits − Σ costs, each divided by (1 + r)^t; and decide. A project is worth doing if NPV > 0 (or the benefit-cost ratio exceeds 1). Its advantage is a common yardstick for choices; its disadvantages are that it must put a price on things that have none (a species, a view), the result is very sensitive to the discount rate, and it can hide who gains and who loses.
Worked example. A dam costs 100 now and yields benefits of 45 a year for three years. At a 10% discount rate, PV of benefits = 45/1.1 + 45/1.21 + 45/1.331 = 40.9 + 37.2 + 33.8 = 111.9, so NPV = 111.9 − 100 = +11.9 and the benefit-cost ratio is 1.12: accept. Now include an environmental cost of 15 a year (lost fisheries, displaced farmland). Net yearly benefit is 30, PV = 30 × 2.4869 = 74.6, so NPV = 74.6 − 100 = −25.4: reject. The project changed from good to bad when the externality was counted, which is the whole argument for including it.
Extended Producer Responsibility (EPR) makes the producer responsible for the whole life cycle of a product, including collection and safe disposal after use. It applies the polluter pays principle: the cost of the waste moves from the municipality and public onto the producer, who then has a reason to design for less waste. Examples are plastic packaging, electronic waste and used batteries, for which Indian rules oblige producers to collect and recycle set shares. Its advantages: lower public cost, incentive for better design, higher recycling.
- Define the project and alternatives
- List impacts
- Put money values on them
- Choose a discount rate
- Compute NPVBenefits minus costs, discounted
- Decide: worth doing if NPV > 0
- Benefit 45 a year for 3 years
- PV of benefits 111.9
- NPV +11.9: accept
- Net benefit 30 a year
- PV 74.6
- NPV −25.4: reject
Cost-benefit analysis (CBA) values all the costs and benefits of a project, discounts future amounts to the present, and compares them. The process: define the project and alternatives…
4. Natural Capital and Ecosystem Services
Natural capital is the stock of forests, soils, water, fisheries, minerals and biodiversity from which a flow of ecosystem services is drawn. The Millennium Ecosystem Assessment (2005) classifies the services in four groups: provisioning (food, water, timber, fibre), regulating (climate, floods, disease, water quality, pollination), cultural (recreation, spiritual and aesthetic value) and supporting (soil formation, photosynthesis, nutrient cycling), which underpin the other three. Degradation follows from forest and biodiversity loss, over-harvesting, pollution and conversion of land. The ecological footprint is the area of productive land and sea needed to supply a population's resources and absorb its wastes; when the footprint exceeds the available biocapacity a country is running down its natural capital, and the disproportionate use of rich countries means their footprint per person is several times that of poor ones. Natural capital regeneration (afforestation, restoring wetlands, soil recovery, letting fish stocks rebuild) matters because the capital is what produces every later year's income.
| Type | Meaning | Example |
|---|---|---|
| Provisioning | Goods taken directly | Food, timber, fresh water |
| Regulating | Control of natural processes | Flood control, pollination |
| Cultural | Non-material benefits | Recreation, sacred groves |
| Supporting | Processes underpinning all others | Soil formation, nutrient cycling |
Natural capital is the stock of forests, soils, water, fisheries, minerals and biodiversity from which a flow of ecosystem services is drawn. The Millennium Ecosystem Assessment (2005)…
Polluter Pays and Producer Responsibility
Two principles of environmental economics are often confused. Under the polluter pays principle, the party that causes pollution bears the cost of cleaning it up or of compensating those harmed, which turns an externality into a cost to the polluter. Under extended producer responsibility, the producer remains responsible for a product after sale, including its collection and recycling at the end of its life, as with batteries and electronic waste. The first is about paying for damage, the second about managing a product through its whole life.
Two principles of environmental economics are often confused. Under the polluter pays principle, the party that causes pollution bears the cost of cleaning it up or of compensating those…
Key takeaways
- Resources are classified by origin, renewal, development stage and distribution; physical accounting uses physical units and needs no prices.
- GDP and GNP measure output, not welfare: they ignore depletion and count defensive expenditure as growth; GNP adds net income from abroad.
- Negative externalities impose unpaid costs and cause over-production; positive externalities cause under-supply.
- CBA discounts future costs and benefits and accepts a project if NPV > 0; including an externality can reverse the result.
- EPR applies the polluter-pays principle; ecosystem services are provisioning, regulating, cultural and supporting.
Practice questions (24)
Attempt each one before opening the answer. Every explanation names the tempting wrong option as well as the right one, because that is where marks are lost.
GNP differs from GDP in that it adds:
Show answer
Answer: A — Net income from abroad
GNP = GDP + net factor income from abroad. Neither measure subtracts environmental damage or adds unpaid work.Factory smoke harming nearby residents is an example of:
Show answer
Answer: D — A negative externality
A cost imposed on third parties and not paid for by the firm is a negative externality.Coal and oil are classified as:
Show answer
Answer: C — Non-renewable resources
They form over geological time and are used much faster than they form, so they are non-renewable.
Show the other 21 questions
Which ecosystem service is soil formation?
Show answer
Answer: B — Supporting
Soil formation, nutrient cycling and photosynthesis are supporting services underpinning the other three.A project costs 100 now and gives 45 a year for 3 years at a 10% discount rate. Its NPV is about:
Show answer
Answer: A — +11.9
PV of benefits is 45 × 2.4869 = 111.9, so NPV = 111.9 − 100 = +11.9. The undiscounted gain would be 35, and 111.9 is the PV before subtracting the cost.Which is a defensive expenditure?
Show answer
Answer: D — Buying water purifiers because the supply is polluted
Spending to repair or avoid damage caused by pollution is defensive; GDP counts it as growth though it only restores a lost benefit.Extended Producer Responsibility rests on which principle?
Show answer
Answer: C — Polluter pays
EPR moves the cost of collecting and disposing of a product from the public to the producer, which is the polluter-pays principle.A beekeeper's bees raise the yield of a neighbour's orchard without payment. This is:
Show answer
Answer: B — A positive externality, likely to be under-supplied
An unpaid benefit to a third party is a positive externality, and because the provider is not rewarded, too little of it is produced.In the dam example, environmental costs of 15 a year are included, so the net annual benefit is 30 for 3 years at 10%. The NPV becomes:
Show answer
Answer: A — −25.4, reject
PV of 30 a year for three years at 10% is 74.6, and 74.6 − 100 = −25.4, so the project fails once the externality is counted. 74.6 alone ignores the capital cost.Statement 1: Physical accounting avoids contested price valuation. Statement 2: Physical accounting lets different resources be added into one total. Which is correct?
Show answer
Answer: A — Only statement 1
Statement 1 is an advantage of physical accounting. Statement 2 is false: tonnes of timber and cubic metres of water cannot be added, which is its main disadvantage.The economist who proposed taxing activities that cause negative externalities, so that polluters pay the external damage, is:
Show answer
Answer: D — A.C. Pigou
A.C. Pigou proposed a tax equal to the external damage, now called a Pigouvian tax. Ronald Coase is the tempting wrong option because he also wrote on externalities, but he argued that bargaining under clear property rights can solve them without a tax.The concept of the "ecological footprint" was developed by:
Show answer
Answer: A — Wackernagel and Rees
Mathis Wackernagel and William Rees developed the ecological footprint. Costanza and Daily are the tempting wrong option because they are linked with another environmental-economics idea, the valuation of ecosystem services and natural capital, not the footprint.One carbon credit is generally equal to the right to emit:
Show answer
Answer: A — One tonne of carbon dioxide equivalent
A carbon credit represents one tonne of CO₂ or its equivalent in other greenhouse gases. One kilogram is the tempting wrong option because it is a common unit, but it understates the credit by a factor of a thousand.Match the ecosystem service category with an example. A. Provisioning B. Regulating C. Cultural D. Supporting — 1. Food and fresh water 2. Flood control and climate regulation 3. Recreation and spiritual value 4. Nutrient cycling
Show answer
Answer: A — A-1, B-2, C-3, D-4
Provisioning gives goods like food and water (1), regulating covers flood control and climate (2), cultural covers recreation and spiritual value (3) and supporting covers processes such as nutrient cycling (4). The tempting wrong pair swaps provisioning and regulating, though one supplies products and the other controls processes.According to the Coase theorem, if property rights are clearly defined and transaction costs are low, then:
Show answer
Answer: A — The parties can bargain to an efficient outcome whatever the initial allocation of rights
Coase argued that private bargaining can internalise an externality when rights are clear and bargaining is cheap. The tempting wrong option, that a tax is always needed, is the Pigouvian view that the Coase theorem challenges.Clean air is an example of a:
Show answer
Answer: B — Public good, since it is non-excludable and non-rival
No one can be excluded from breathing clean air and one person's use does not reduce another's, so it is a public good, which invites free riding. A private good is the tempting wrong option because we do consume air, but private goods are both excludable and rival.Green GDP differs from conventional GDP in that it:
Show answer
Answer: A — Subtracts the depletion of natural capital and environmental damage
Green GDP adjusts the national income for the depletion of natural resources and environmental degradation. Adding imports is the tempting wrong option because it relates to how other national-income figures such as GNP are built, but it has no link to environmental adjustment.A higher discount rate in cost-benefit analysis generally makes projects whose benefits come far in the future:
Show answer
Answer: C — Less attractive
A higher discount rate shrinks the present value of distant benefits, so long-term environmental projects look less attractive. More attractive is the tempting wrong option for those who confuse the discount rate with growth; discounting always weights the future less.Assertion (A): A carbon tax is an economic instrument for dealing with climate change. Reason (R): It puts a price on emissions, so that polluters bear the external cost of the damage they cause.
Show answer
Answer: A — Both A and R are true, and R is the correct explanation of A
Both are true and R explains A: by pricing emissions the tax makes polluters internalise the external cost. The tempting option that R is not the explanation overlooks that pricing the externality is the whole mechanism by which a tax works.Consider the statements about measuring development and impact.
(1) The Human Development Index was devised by Mahbub ul Haq.
(2) The HDI combines income, education and health.
(3) The HDI directly measures environmental sustainability.
(4) The ecological footprint measures human demand on nature in global hectares.Show answer
Answer: A — (1), (2) and (4) only
Statements 1, 2 and 4 are correct. Statement 3 is false: the HDI does not include environmental sustainability, which is why a country can score high on HDI while having a large ecological footprint.A country's residents have an ecological footprint of 2.8 global hectares per person, but the country's biocapacity is 1.6 hectares per person. Its footprint is how many times its biocapacity?
Show answer
Answer: D — 1.75 times
Ratio = 2.8 ÷ 1.6 = 1.75; check: 1.6 × 1.75 = 2.8. The tempting wrong option is 1.2, which is the deficit (2.8 − 1.6) in hectares and not the ratio, and 0.57 is the ratio inverted.A project costs 200 now and returns 120 at the end of year 1 and 120 at the end of year 2. At a 20% discount rate its net present value is about:
Show answer
Answer: A — −16.7
PV = 120 ÷ 1.2 + 120 ÷ 1.44 = 100 + 83.3 = 183.3, so NPV = 183.3 − 200 = −16.7; check: annuity factor 1.528 × 120 = 183.3. The tempting wrong option is +40, which adds the returns without discounting (240 − 200) and so wrongly approves a project that fails once discounted.Firm A emits 100 tonnes above its cap and could abate them itself at 35 per tonne. Firm B has 100 tonnes of unused allowances. If they trade at 20 per tonne, how much does Firm A save compared with abating itself?
Show answer
Answer: B — 1,500
Abating herself costs 100 × 35 = 3,500, buying costs 100 × 20 = 2,000, so the saving is 1,500; check: 100 × (35 − 20) = 1,500. The tempting wrong option is 2,000, which is the amount paid for the allowances and not the saving.Which statement correctly contrasts a carbon tax with a cap-and-trade system?
Show answer
Answer: A — A tax fixes the price and lets emissions vary; cap-and-trade fixes the quantity and lets the price vary
A tax sets the price per tonne and the amount of emission responds, while a cap sets the total quantity and the permit price is found in the market. The tempting wrong option reverses the two, which is a common confusion between price-based and quantity-based instruments.