Wastewater II: Sewer Design to a Flow Criterion, Tertiary Treatment (Nitrogen, Phosphorus, Filtration, Disinfection), Receiving-Water Oxygen Sag and Effluent Standards

Section 5 of the CE paper asks for the design of a sewerage system, primary, secondary and tertiary treatment, and effluent discharge standards — and the existing chapter stops at secondary treatment and sludge. This chapter adds three things. Sewer design to a flow criterion: the design flow is the peak, from Harmon's factor P = 1 + 14/(4 + √p) = 2.26 for 50 000 people; a 600 mm sewer at gradient 1 in 500 runs full at 0.97 m/s and 0.275 m³/s, and the peak flow of 0.142 m³/s fills it to d/D ≈ 0.51 — while the minimum flow must still reach about 0.6 m/s. Tertiary treatment removes what secondary treatment leaves: 30 mg/L ammonia-N takes 740 kg O₂ a day at 5.4 MLD to nitrify and 214 mg/L of alkalinity; 6 mg/L of phosphorus needs about 65 mg/L of alum at the theoretical Al:P ratio. In the river, the Streeter–Phelps sag places the critical point 2.56 days downstream, with a dissolved-oxygen low of 4.8 mg/L. The discharge standards decide how much of all this a plant must do.
Overview

Sewer Design: Peak Factor, Manning's Equation and Partial Flow

2 min read · 2 parts

A sanitary sewer is a gravity channel designed for the peak dry-weather flow with checks at the minimum. Average flow is 70–80% of water supply; the peak factor (peak/average) for a population p (in thousands) is Harmon's P = 1 + 14/(4 + √p) — 2.26 for 50 (about 3.8 for a small village of 1000, about 1.5 for a city of a million). For the town of 50 000 with average flow 5400 m³/d = 0.0625 m³/s, the design peak is 0.1415 m³/s; the minimum is about one-third of the average, 0.0208 m³/s. A sewer is designed to run not more than about 0.8 full at peak (leaving air space for gases and surges). Manning's equation V = (1/n)R^(2/3)S^(1/2), with n = 0.013 for concrete: a circular sewer of D = 0.6 m laid at S = 0.002 has R = D/4 = 0.15 m when full, so V_full = (1/0.013) × 0.15^(2/3) × 0.002^(1/2) = 0.971 m/s and Q_full = V·πD²/4 = 0.2746 m³/s (the 0.6 m diameter and 1:500 gradient are a typical start).

Partial flow. A sewer runs part full, so the hydraulic elements (ratios to the full-bore value) are used: for depth ratio r = d/D, θ = 2 arccos(1 − 2r), A = (D²/8)(θ − sin θ), P = Dθ/2, R = A/P; then q/Q_full = (A R^(2/3))/(A_f R_f^(2/3)) and v/V_full = (R/R_f)^(2/3) (for constant n and S). At r = 0.5, v/V_full = 1.0 and q/Q_full = 0.5; the velocity peaks at r ≈ 0.81 (1.14 V_full) and the discharge at r ≈ 0.95 (1.08 Q_full), but a circular sewer carries less when full than at 0.95. Peak flow: q/Q_full = 0.515, so r = 0.51, v = 1.008 V_full = 0.98 m/s (above the self-cleansing 0.6 m/s). Minimum-flow check: q/Q_full = 0.076, r = 0.19, v = 0.57 m/s, which is slightly below 0.6 m/s here — the gradient or diameter must be revised, or the sewer is flushed, since solids will deposit at night flows. The velocity must lie between 0.6–0.9 m/s (minimum) and 3 m/s (maximum); the minimum gradient for a small sewer is often set from a tractive-force condition, τ = γRS ≥ 1–2 N/m².

Hydraulic elements of a circular sewer (constant n)
d/Dq/Q_fullv/V_full
0.20.0880.615
0.30.1960.776
0.40.3370.902
0.50.5001.000
0.60.6721.072
0.70.8371.120
0.80.9771.140
1.01.0001.000

A sanitary sewer is a gravity channel designed for the peak dry-weather flow with checks at the minimum. Average flow is 70–80% of water supply; the peak factor (peak/average) for a…

Tertiary Treatment: Nitrogen Removal by Nitrification and Denitrification

1 min read · 2 parts

Tertiary (advanced) treatment polishes secondary effluent for what it leaves: nutrients (N, P), fine suspended solids, dissolved organics and salts, and pathogens. Nitrogen removal is biological: nitrification (autotrophic, aerobic, slow, needing a long sludge age and alkalinity) NH₄⁺ + 2O₂ → NO₃⁻ + 2H⁺ + H₂O, then denitrification (heterotrophic, anoxic, using BOD as the carbon source) NO₃⁻ → N₂ gas. Stoichiometry: 4.57 g O₂ per g NH₄-N oxidised, 7.14 g alkalinity as CaCO₃ per g NH₄-N consumed; denitrification returns 2.86 g O₂-equivalent and 3.57 g alkalinity per g NO₃-N. For 30 mg/L NH₄-N in 5400 m³/d: oxygen = 30 × 4.57 × 5400/1000 = 740 kg/d, alkalinity consumed = 214 mg/L as CaCO₃ (lime or bicarbonate must be added if the effluent has less). Layouts: a pre-anoxic (Ludzack–Ettinger/MLE) tank with an internal recycle, or sequencing batch reactors. Un-ionised NH₃ is toxic to fish, so ammonia limits are tight.

Biological nitrogen removal
  1. NitrificationAutotrophic, aerobic: NH₄⁺ → NO₃⁻
  2. DenitrificationHeterotrophic, uses BOD: NO₃⁻ → N₂
Nitrification needs 4.57 g O₂ and 7.14 g alkalinity per g NH₄-N.

Tertiary (advanced) treatment polishes secondary effluent for what it leaves: nutrients (N, P), fine suspended solids, dissolved organics and salts, and pathogens. Nitrogen removal is…

Phosphorus Removal, Filtration, Membranes and Disinfection

2 min read · 2 parts

Phosphorus removal is chemical (alum, ferric chloride or lime precipitates the phosphate) or biological (an anaerobic zone that makes phosphate-accumulating organisms take up extra P). With alum, Al₂(SO₄)₃·18H₂O (M = 666.4 g/mol) supplies 2 Al per formula, and Al³⁺ + PO₄³⁻ → AlPO₄: one mole of Al per mole of P, so the theoretical dose is 666.4/(2 × 30.97) = 10.76 g alum per g P: for 6 mg/L P, 64.6 mg/L; in practice 1.5–2 times the stoichiometric Al:P because of competing hydroxide formation — 129 mg/L, giving 697 kg alum/day at 5400 m³/d (and extra sludge). Filtration (rapid sand or dual-media, or membrane) removes residual suspended solids to < 10 mg/L; activated carbon adsorbs dissolved organics and colour; reverse osmosis removes dissolved salts against the osmotic pressure π = iMRT (for 2000 mg/L NaCl: M = 0.0342 mol/L, i = 2, π = 1.65 atm ≈ 167 kPa, so the applied pressure must exceed it), with 95–99% salt rejection; ion exchange polishes ammonia or hardness.

Disinfection is the last barrier. Chlorine kills by Chick–Watson kinetics, N/N₀ = exp(−kC t): a 4-log (99.99%) reduction needs C t = 4 ln 10/k = 9.2 mg·min/L for k = 1.0 L/mg·min — for instance 0.5 mg/L for 18 min. Chlorine reacts first with ammonia and organics, so the breakpoint dose is needed to leave a free residual; ozone and UV (a dose in mJ/cm², unaffected by ammonia and leaving no residual) are alternatives, and dechlorination follows if the river is sensitive. The sequence in a complete plant: screens → grit → primary → secondary → tertiary (N, P removal, filter) → disinfection → outfall or reuse.

ProcessRemovesKey figure
NitrificationNH₄-N (to nitrate)4.57 g O₂ and 7.14 g alkalinity per g N
DenitrificationNO₃-N (to N₂ gas)2.86 g O₂ equivalent and 3.57 g alkalinity returned per g N
Alum precipitationPhosphate10.76 g alum per g P (theoretical)
FiltrationFine suspended solidsTo < 10 mg/L
Reverse osmosisDissolved salts95–99% rejection, π = iMRT
Phosphorus removal
Phosphorus removal
  • ChemicalAlum, ferric chloride or lime precipitates phosphate
  • BiologicalAnaerobic zone; phosphate-accumulating organisms

Phosphorus removal is chemical (alum, ferric chloride or lime precipitates the phosphate) or biological (an anaerobic zone that makes phosphate-accumulating organisms take up extra P). With…

Oxygen Sag in the Receiving Water and Effluent Discharge Standards

2 min read · 2 parts

An effluent is judged by what it does to the river's oxygen. After mixing, the remaining ultimate BOD L decays with the deoxygenation constant k₁ (L = L₀e^(−k₁t)) while atmospheric reaeration restores oxygen at rate k₂ times the deficit D; the Streeter–Phelps equation gives D(t) = [k₁L₀/(k₂ − k₁)](e^(−k₁t) − e^(−k₂t)) + D₀e^(−k₂t). The critical time (maximum deficit) is t_c = [1/(k₂ − k₁)] ln{(k₂/k₁)[1 − D₀(k₂ − k₁)/(k₁L₀)]} and D_c = (k₁/k₂)L₀e^(−k₁t_c). Take k₁ = 0.23 d⁻¹, k₂ = 0.46 d⁻¹, mixed ultimate BOD L₀ = 15 mg/L, initial deficit D₀ = 1.5 mg/L, saturation DO = 9.0 mg/L: t_c = 2.56 d, D_c = 4.17 mg/L, minimum DO = 9.0 − 4.17 = 4.83 mg/L. For a river at 0.5 m/s this is a distance of 0.5 × 86 400 × 2.56 = 110 km downstream. The sag gets worse (a) with a higher L₀ (less treatment), (b) in summer (warm water, lower DO_sat and faster k₁), (c) in slow, deep rivers (low k₂); and the DO must stay above 4 mg/L for fish in most standards.

Effluent discharge standards in India are set by the Central Pollution Control Board under the Environment (Protection) Rules; the limit depends on the receiving body and the plant category. As commonly recalled (to be checked against the current notification): general standards for discharge into inland surface water — BOD (3 days at 27 °C) 30 mg/L, suspended solids 100 mg/L, COD 250 mg/L, pH 5.5–9.0, oil and grease 10 mg/L; for irrigation on land BOD 100 mg/L and suspended solids 200 mg/L; for sewage treatment plants the more recent standards for discharge to water bodies are tighter — BOD ≤ 10–20 mg/L, suspended solids ≤ 20–50 mg/L, with limits on fecal coliform and, in sensitive areas, total nitrogen and phosphorus. The design consequence: a BOD limit of 30 mg/L is met by secondary treatment (about 90% removal of a 250 mg/L sewage), while 10 mg/L plus nutrient limits require tertiary treatment; the reuse category (irrigation, cooling, recharge) sets its own, often stricter, microbiological limit.

Discharge toBOD₃,₂₇ limitSuspended solids
Inland surface water (general)30 mg/L100 mg/L
Land for irrigation100 mg/L200 mg/L
STP to water body (recent, indicative)10–20 mg/L20–50 mg/L
🎯 BOD from the first-order rate, and why the sag has a minimum
BOD exerted in time t is L₀(1 − e^(−kt)). With k = 0.23 per day (base e), the five-day BOD is L₀(1 − e^(−1.15)) = 0.683 L₀, so the ultimate BOD is about 1.46 times BOD₅. Below an outfall the oxygen deficit rises while deoxygenation outpaces reaeration, reaches a maximum at the critical time, and then falls as reaeration dominates; the Streeter–Phelps curve gives the minimum dissolved oxygen, which is compared with the standard for the stream.

An effluent is judged by what it does to the river's oxygen. After mixing, the remaining ultimate BOD L decays with the deoxygenation constant k₁ (L = L₀e^(−k₁t)) while atmospheric…

Key takeaways

  • Peak factor P = 1 + 14/(4 + √p) (Harmon, p in thousands); design the sewer for the peak at ≤ 0.8 full and check the minimum flow for a velocity of about 0.6 m/s (self-cleansing) up to 3 m/s.
  • Manning V = (1/n)R^(2/3)S^(1/2); a circular sewer's partial-flow elements come from θ = 2 arccos(1 − 2d/D); velocity is the same at half and full depth, discharge peaks near 0.95 D.
  • Tertiary treatment: nitrification uses 4.57 g O₂ and 7.14 g alkalinity per g NH₄-N, denitrification returns 2.86 g O₂ and 3.57 g alkalinity per g NO₃-N; alum removes phosphorus at ≈ 10.76 g per g P theoretically (more in practice).
  • Filtration, activated carbon, reverse osmosis (π = iMRT) and ion exchange polish effluent; chlorine disinfection follows Chick–Watson, N/N₀ = exp(−kCt).
  • Streeter–Phelps gives the DO sag with critical time t_c and deficit D_c; effluent standards (BOD 30 mg/L general, tighter for STPs) decide whether secondary or tertiary treatment is needed.

Practice questions (24)

Attempt each one before opening the answer. Every explanation names the tempting wrong option as well as the right one, because that is where marks are lost.

  1. The Harmon peak factor for a town of 50 000 people, P = 1 + 14/(4 + √p) with p in thousands, is (two decimals):

    Numerical answer — type the value.

    Show answer

    Answer: 2.26

    √50 = 7.07; P = 1 + 14/11.07 = 2.26. The peak flow is therefore 2.26 times the average.
  2. A 600 mm circular concrete sewer (n = 0.013) is laid at a gradient of 1 in 500. Its full-bore velocity in m/s (two decimals) is:

    Numerical answer — type the value.

    Show answer

    Answer: 0.97

    R = D/4 = 0.15 m; V = (1/0.013) × 0.15^(2/3) × 0.002^(1/2) = 0.971 m/s; Q_full = 0.275 m³/s.
  3. For a circular sewer with constant n and slope, the velocity at half depth compared with that when running full is:

    1. equal
    2. double
    3. 1.14 times
    4. half
    Show answer

    Answer: A — equal

    At d/D = 0.5 the hydraulic radius equals that of the full pipe (A and P both halve), so v/V_full = 1. The maximum velocity, 1.14 V_full, occurs near d/D = 0.81.
Show the other 21 questions
  1. Nitrification of 1 g of ammonia-nitrogen requires about how much oxygen (theoretical)?

    1. 4.57 g
    2. 2.86 g
    3. 1.0 g
    4. 7.14 g
    Show answer

    Answer: A — 4.57 g

    NH₄⁺ + 2O₂ → NO₃⁻ + 2H⁺ + H₂O: 64 g O₂ per 14 g N = 4.57. 2.86 is the oxygen equivalent recovered by denitrification and 7.14 is the alkalinity (as CaCO₃) consumed.
  2. A plant at 5400 m³/d must nitrify 30 mg/L of ammonia-nitrogen. Using 4.57 g O₂ per g N, the oxygen required in kg per day (nearest integer) is:

    Numerical answer — type the value.

    Show answer

    Answer: 740

    N load = 30 g/m³ × 5400 m³/d = 162 kg/d; O₂ = 162 × 4.57 = 740 kg/d.
  3. Alum, Al₂(SO₄)₃·18H₂O (M = 666.4), is used for phosphorus removal at a 1:1 molar Al:P ratio. The theoretical dose to remove 6 mg/L of P (M = 30.97) in mg/L of alum (one decimal) is:

    Numerical answer — type the value.

    Show answer

    Answer: 64.6

    Each mole of alum supplies 2 mol Al, so 666.4/(2 × 30.97) = 10.76 g alum per g P; × 6 = 64.6 mg/L. Practical doses are 1.5–2 times this.
  4. In the Streeter–Phelps oxygen-sag analysis, the critical point is the point of:

    1. maximum oxygen deficit, where deoxygenation rate equals reaeration rate
    2. maximum BOD
    3. zero BOD
    4. the outfall itself
    Show answer

    Answer: A — maximum oxygen deficit, where deoxygenation rate equals reaeration rate

    The deficit grows while k₁L exceeds k₂D and shrinks afterwards; the maximum is where k₁L = k₂D (dD/dt = 0), downstream of the outfall.
  5. With k₁ = 0.23 d⁻¹, k₂ = 0.46 d⁻¹, L₀ = 15 mg/L, D₀ = 1.5 mg/L and DO_sat = 9.0 mg/L, the minimum dissolved oxygen downstream (Streeter–Phelps), in mg/L (one decimal), is:

    Numerical answer — type the value.

    Show answer

    Answer: 4.8

    t_c = [1/0.23] ln{2[1 − 1.5 × 0.23/(0.23 × 15)]} = 2.56 d; D_c = 0.5 × 15 × e^(−0.23 × 2.56) = 4.17 mg/L; DO_min = 9.0 − 4.17 = 4.8 mg/L.
  6. Which statements about wastewater treatment levels and standards are correct?

    1. Primary sedimentation alone removes most dissolved BOD
    2. Secondary treatment can meet a BOD limit of 30 mg/L
    3. Tertiary treatment is needed to remove nutrients such as nitrogen and phosphorus
    4. Reverse osmosis is a tertiary process that removes dissolved salts
    Show answer

    Answer: B — Secondary treatment can meet a BOD limit of 30 mg/L; C — Tertiary treatment is needed to remove nutrients such as nitrogen and phosphorus; D — Reverse osmosis is a tertiary process that removes dissolved salts

    Primary treatment removes only about 30–35% of BOD because most of the demand is dissolved or colloidal; secondary biological treatment achieves roughly 90%.
  7. For a 4-log (99.99%) kill of coliforms with Chick–Watson kinetics, k = 1.0 L/mg·min, the required product C·t in mg·min/L (one decimal) is:

    Numerical answer — type the value.

    Show answer

    Answer: 9.2

    ln(N₀/N) = kC t = ln 10⁴ = 9.21, so C t = 9.2 mg·min/L; at 0.5 mg/L that is about 18 minutes of contact.
  8. A river has a saturation dissolved oxygen of 9.0 mg/L and an actual DO of 6.5 mg/L. The oxygen deficit, in mg/L, is ____.

    Numerical answer — type the value.

    Show answer

    Answer: 2.5

    D = DO_sat − DO = 9.0 − 6.5 = 2.5 mg/L. Quoting the actual DO of 6.5 mg/L reports the oxygen present, not the shortfall.
  9. Tertiary (advanced) treatment of sewage is mainly aimed at removing:

    1. most of the settleable solids
    2. nutrients such as nitrogen and phosphorus and residual fine solids
    3. heavy grit
    4. coarse floating material
    Show answer

    Answer: B — nutrients such as nitrogen and phosphorus and residual fine solids

    Secondary treatment already removes most BOD and settleable solids; tertiary stages polish the effluent by removing nutrients, fine solids and often pathogens. Coarse material and grit are removed in preliminary treatment.
  10. The average sewage flow from a town is 2 MLD. With a peak factor of 3, the design peak flow, in MLD, is ____.

    Numerical answer — type the value.

    Show answer

    Answer: 6

    Peak flow = peak factor × average = 3 × 2 = 6 MLD. Dividing 2/3 inverts the factor. Substituting the answer back into the relation confirms it.
  11. A sanitary sewer is designed so that, at the design peak flow, the velocity is at least about:

    1. 0.6 m/s, to be self-cleansing
    2. 6 m/s, to prevent odours
    3. 0 m/s, since gravity does the work
    4. 0.06 m/s, to save energy
    Show answer

    Answer: A — 0.6 m/s, to be self-cleansing

    A minimum of about 0.6 m/s prevents organic solids from depositing in the sewer (self-cleansing); there is also an upper limit near 3 m/s to avoid erosion. Very low velocities would let silt settle.
  12. A river of flow 9 m³/s and BOD 2 mg/L receives an effluent of 1 m³/s with BOD 200 mg/L. After complete mixing, the BOD, in mg/L, is ____.

    Numerical answer — type the value.

    Show answer

    Answer: 21.8

    Mass balance: (9 × 2 + 1 × 200)/10 = 21.8 mg/L. The simple average (101 mg/L) ignores the flow weights. Substituting the answer back into the relation confirms it.
  13. A sewer laid at a gradient of 1 in 500 has a slope, in per cent, of ____.

    Numerical answer — type the value.

    Show answer

    Answer: 0.2

    Slope = 1/500 = 0.002 = 0.2 %. Answering 2 % moves the decimal point by one place too few. Substituting the answer back into the relation confirms it.
  14. A river receives an effluent so that the mixed flow has DO = (10 m³/s × 8 mg/L + 1 m³/s × 2 mg/L)/11 m³/s. The mixed DO, in mg/L to two decimal places, is ____.

    Numerical answer — type the value.

    Show answer

    Answer: 7.45

    DO = (80 + 2)/11 = 7.45 mg/L, weighted by flow. The unweighted average of 8 and 2 (5 mg/L) ignores the 10:1 flow ratio.
  15. In the Streeter–Phelps analysis k₁ = 0.2 d⁻¹, k₂ = 0.4 d⁻¹, L₀ = 20 mg/L and D₀ = 2 mg/L. The time to the critical (minimum DO) point, t_c = [1/(k₂ − k₁)] ln{(k₂/k₁)[1 − D₀(k₂ − k₁)/(k₁L₀)]}, in days to two decimal places, is ____.

    Numerical answer — type the value.

    Show answer

    Answer: 2.94

    t_c = (1/0.2) ln{2[1 − 2 × 0.2/(0.2 × 20)]} = 5 ln(2 × 0.9) = 5 ln 1.8 = 2.94 d; a time-stepping solution of the two rate equations peaks at the same 2.94 d. Using k₂ in the prefactor (1/0.4) halves the time.
  16. Phosphorus (6 mg/L as P, atomic weight 30.97) is precipitated with alum, Al₂(SO₄)₃·18H₂O (M = 666.4), at an Al:P molar ratio of 1.5:1. The alum dose, in mg/L to the nearest integer, is ____.

    Numerical answer — type the value.

    Show answer

    Answer: 97

    P = 6/30.97 = 0.1937 mmol/L; Al needed = 1.5 × 0.1937 = 0.2906 mmol/L; each mole of alum has 2 mol Al, so alum = 0.1453 mmol/L × 666.4 = 96.8 ≈ 97 mg/L. Forgetting that alum contains two Al atoms would double the dose to 194 mg/L.
  17. For a circular sewer flowing half full, compared with the same sewer flowing full (same slope and roughness), the discharge is:

    1. half, with the same velocity
    2. equal, with the same velocity
    3. twice, with half the velocity
    4. half, with half the velocity
    Show answer

    Answer: A — half, with the same velocity

    At half depth the hydraulic radius is still D/4, so the velocity equals the full-flow velocity, but the area is half, so the discharge is half. The velocity is not halved.
  18. For the same stream (k₁ = 0.2 d⁻¹, k₂ = 0.4 d⁻¹, L₀ = 20 mg/L, D₀ = 2 mg/L) the maximum oxygen deficit D_c = (k₁/k₂) L₀ exp(−k₁t_c), in mg/L to two decimal places, is ____.

    Numerical answer — type the value.

    Show answer

    Answer: 5.56

    With t_c = 2.94 d, D_c = 0.5 × 20 × e^(−0.2 × 2.94) = 10 × 0.5556 = 5.56 mg/L, and the numerical integration of the deficit equation peaks at the same value. The initial deficit 2 mg/L is not the maximum.
  19. The stream above flows at 0.25 m/s. The distance downstream to the critical point (t_c = 2.94 d), in km to the nearest integer, is ____.

    Numerical answer — type the value.

    Show answer

    Answer: 63

    Distance = u t_c = 0.25 m/s × 2.94 × 86 400 s = 63 500 m ≈ 63 km (63.5). Forgetting to convert days into seconds would give an absurd number.
  20. A 600 mm circular sewer (n = 0.013, slope 0.002) flows at a depth ratio d/D = 0.3. Using Manning’s equation with the partial-flow geometry (θ = 2 cos⁻¹(1 − 2d/D)), the discharge, in L/s to the nearest integer, is ____.

    Numerical answer — type the value.

    Show answer

    Answer: 54

    θ = 2 cos⁻¹(0.4) = 2.319 rad; A = (D²/8)(θ − sin θ) = 0.0713 m², P = Dθ/2 = 0.696 m, R = 0.1026 m; V = (1/0.013) R^(2/3) S^(1/2) = 0.754 m/s, so Q = 0.0713 × 0.754 = 0.0538 m³/s = 54 L/s. This is 19.6 % of the full-pipe capacity (275 L/s), not 30 %.
  21. A treatment plant reduces BOD from 250 mg/L in the influent to 25 mg/L in the effluent. Its BOD removal efficiency, in per cent, is ____.

    Numerical answer — type the value.

    Show answer

    Answer: 90

    Efficiency = (250 − 25)/250 × 100 = 90 %. Dividing by the effluent value instead gives 900 %, which is impossible.